Home › ENGINE › 2GR-FE EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL CHARCOAL CANISTER ASSEMBLY


    A162862
  1. Install the 3 bolts and charcoal canister.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

  1. Connect the purge line hose to the charcoal canister.

  1. Connect the wire harness clamp.

  1. Connect the vapor pressure sensor connector.

  1. Connect the charcoal canister filter sub-assembly to the charcoal canister.

  1. Connect the fuel tank vent hose to the charcoal canister.



2. INSTALL CHARCOAL CANISTER PROTECTOR
  1. Install the 6 bolts and charcoal canister protector.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }