CANISTER > INSPECTION |
| 1. INSPECT CHARCOAL CANISTER ASSEMBLY |
![]() |
Visually check the charcoal canister for cracks or damage.
If cracks or damage are found, replace the charcoal canister assembly.
![]() |
Check charcoal canister operation.
With the purge port closed, blow 1.67 kPa (17.0 gf/cm2, 0.24 psi) of air into the vent port, and check that air flows from the air inlet port.
If the result is not as specified, replace the charcoal canister assembly.
![]() |
With the vent port closed, blow 1.10 kPa (11.2 gf/cm2, 0.16 psi) of air to the air inlet port, and check that air flows from the purge port.
If the result is not as specified, replace the charcoal canister assembly.
![]() |
Check for air leakage.
Remove the air hose between ports A and B.
Connect SST (pressure gauge) to the vent port of the charcoal canister.
While holding port B, with the purge port and the air inlet port closed and port A open, apply 19.6 kPa (0.2 kgf/cm2, 2.81 psi) of pressurized air into the vent port, then confirm that pressure is retained for 1 minute.
If the result is not as specified, replace the charcoal canister assembly.
![]() |
Check the leak detection pump.
Remove the detection pump from the charcoal canister.
Check that air flows from port A to B and then C.
If the result is not as specified, replace the charcoal canister assembly.
![]() |
Connect the positive (+) lead to terminal 7 and the negative (-) lead to terminal 6.
Check that the valve is closed.
If the result is not as specified, replace the charcoal canister assembly.
Install the detection pump.