PROPELLER SHAFT ASSEMBLY (for 4WD) > INSPECTION |
| 1. INSPECT SPIDER BEARING |
![]() |
Check that the spider bearing moves smoothly by turning the flange.
Check for the looseness around the joint by strongly moving the flange in the axial and radial directions.
| 2. INSPECT INTERMEDIATE SHAFT |
![]() |
Using a dial gauge, check for the swing of the intermediate shaft.
![]() |
Using a dial gauge, check for the runout of the front side of the intermediate shaft flange.
![]() |
Set a dial gauge outside the bolt hole on the rear side flange of the intermediate shaft, and check for runout in the horizontal direction.
![]() |
Set a dial gauge to the circumference of the intermediate shaft flange, and check for runout in the vertical direction.
| 3. INSPECT PROPELLER SHAFT ASSEMBLY |
![]() |
Using a dial gauge, check for the swing of the propeller shaft assembly.
| 4. INSPECT CENTER SUPPORT BEARING ASSEMBLY NO.1 |
![]() |
Turn the bearing by hand with applying force in the direction of rotating. Check that the bearing turns smoothly.
Check that the seals and bracket are not cracked or damaged.
| 5. INSPECT CENTER SUPPORT BEARING ASSEMBLY NO.1 |
Inspect the center support bearing assembly No. 1 (rear) following the same procedures as for the center support bearing assembly No. 1 (front).
| 6. INSPECT PROPELLER SHAFT ASSEMBLY REAR |
![]() |
Using a dial gauge, check for the runout of the rear propeller shaft assembly rear.