Home › ENGINE › 2GR-FE EMISSION CONTROL › PURGE VALVE

PURGE VALVE > REMOVAL

for Preparation Click here



1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL


2. REMOVE V-BANK COVER SUB-ASSEMBLY


    A162365
  1. Hold the front of the V-bank cover and raise it to disengage the 2 clips on the front of the cover. Continue to raise the cover to disengage the clip on the rear of the cover and remove the cover.

    NOTICE:
    Attempting to disengage both front and rear clips at the same time may cause the cover to break.



3. REMOVE PURGE VSV


    A132952E01
  1. Disconnect the purge VSV connector.

  1. Disconnect the 2 purge line hoses from the purge VSV.

  1. Remove the purge VSV from the air cleaner hose.



    A132953
  1. Remove the bolt and No. 1 vacuum switching valve.