Home › ENGINE › 2GR-FE EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VENTILATION VALVE


    A105280E04
  1. Install the ventilation valve.

    1. Apply adhesive to 2 or 3 threads.

      Adhesive:
      Part No. 08833-00070, Three Bond 1324 or equivalent



    2. A138519E01
    3. Install the ventilation valve.

      Torque:
      27 N*m{ 275 kgf*cm , 20 ft.*lbf }



2. CONNECT VENTILATION HOSE


    A135715E01
  1. Connect the ventilation hose to the ventilation valve.



3. INSTALL V-BANK COVER SUB-ASSEMBLY


    A162365
  1. Fit the 3 retainers and install the V-bank cover.