Home › TRANSMISSION ยท U151E AUTOMATIC TRANSAXLE › SHIFT LEVER

SHIFT LEVER > INSTALLATION

for Preparation Click here



1. INSTALL SHIFT LEVER ASSEMBLY


    C086321E01
  1. Install shift lever assembly to the vehicle with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    Into datum hole of shift lever into datum pin of instrument lower.

  1. Connect the 2 connectors to the shift lever assembly.



2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    C086312E02
  1. Install the cable outer to the shift lever plate



    D030843E02
  1. When installing the transmission control cable assembly on the shift lever plate, place the projection to the shift lever plate (FIG. 2).
    Confirm that the spring in the shift cable outer has moved to the position (FIG. 3) shown in the illustration.
    Confirm that the shift cable is installed on the shift lever plate properly.

    NOTICE:
    1. To prevent torsion of the inner cable, the projection on the eye end should face rear.
    2. Push the cable end to the bottom of the pin.



3. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY LOWER CENTER

HINT:



4. INSTALL SHIFT LEVER CAP


    C086304
  1. Install the shift lever cap to the floor shift position indicator housing assembly.



5. INSTALL POSITION INDICATOR HOUSING ASSEMBLY


    C086303E02
  1. install the position indicator housing assembly to the instrument cluster finish panel assembly center.



6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    C086302E02
  1. install the shift lever knob sub-assembly.



7. ADJUST SHIFT LEVER POSITION

HINT:



8. INSPECT SHIFT LEVER POSITION

HINT:



9. INSPECT KEY INTER LOCK OPERATION

HINT:



10. INSPECT SHIFT LOCK OPERATION

HINT:



11. INSPECT SHIFT LOCK RELEASE BUTTON OPERATION

HINT: