Home › SUSPENSION & AXLE › SUSPENSION › FRONT LOWER BALL JOINT

FRONT LOWER BALL JOINT > INSPECTION

for Preparation Click here



1. INSPECT LOWER BALL JOINT ASSEMBLY FRONT LH


    ZX01712
  1. As shown in the illustration, flip the ball joint stud back and forth 5 times, before installing the nut.

  1. Using a torque wrench, turn the nut continuously at a rate of 3 - 5 seconds per 1 turn and take the torque reading on the 5th turn.

    Turning torque:
    0.98 to 3.43 N*m (10 to 35 kgf*cm, 8.7 to 30 in.*lbf)