Home › BODY ELECTRICAL › NAVIGATION › NAVIGATION SYSTEM

NAVIGATION SYSTEM > Navigation Receiver Assembly Power Source Circuit

for Preparation Click here


DESCRIPTION

This is the power source circuit to operate the navigation receiver assembly.

WIRING DIAGRAM


E121223E29


INSPECTION PROCEDURE

1.INSPECT NAVIGATION RECEIVER ASSEMBLY


    E113513E01
  1. Disconnect the navigation receiver assembly connector R15.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester connection
    Condition
    Specified condition
    GND - Body ground
    Always
    Below 1 Ω

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester connection
    Condition
    Specified condition
    B - GND
    Always
    10 to 14 V
    ACC - GND
    Ignition SW ACC
    10 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE