Home › ENGINE › 2GR-FE INTAKE › INTAKE AIR CONTROL VALVE

INTAKE AIR CONTROL VALVE > REMOVAL

for Preparation Click here



1. REMOVE NO. 2 AIR CLEANER INLET


    A133004
  1. Disconnect the vacuum switching valve clamp.

  1. Disconnect the 2 vacuum hoses.

  1. Remove the 2 bolts and No. 2 air cleaner inlet.



2. REMOVE AIR CLEANER CAP SUB-ASSEMBLY


    A162723E01
  1. Disconnect the 3 vacuum hoses.



    A162726
  1. Loosen the bolt, disconnect the 2 connectors, and remove the 2 vacuum hoses.



    A161845
  1. Remove the 2 bolts, air cleaner cap sub-assembly, and air cleaner filter element.



3. REMOVE NO. 3 INTAKE AIR CONTROL VALVE ASSEMBLY


    A162725
  1. Disengage the 2 claws and remove the No. 3 intake air control valve assembly.