Home › ENGINE › 2GR-FE ENGINE CONTROL SYSTEM › SFI SYSTEM

SFI SYSTEM > Cranking Holding Function Circuit

for Preparation Click here


DESCRIPTION

The system detects the ignition switch's starting signal (STSW) and then supplies current to the starter until the ECM judges that the engine has started successfully. The purpose is to reduce the holding time of the ignition key.

A166695E03


WIRING DIAGRAM

Refer to DTC P0617 .

INSPECTION PROCEDURE

1.CHECK CRANKING
  1. When starting the engine, check whether the starter motor starts.

OK:
Engine is cranking.



OK
CHECK FOR INTERMITTENT PROBLEMS
NG


2.READ VALUE USING TECHSTREAM (STA SIGNAL)
  1. Connect the Techstream to the DLC3.

  1. Turn the ignition switch to the ON position.

  1. Turn the tester on.

  1. Select the following menu items: Powertrain / Engine and ECT / Data List / Starter Signal.

  1. Check the result when the ignition switch is turned ON and when the engine is started.

    OK:

    Display (STARTER SIG)
    Condition
    OFF
    Ignition switch ON
    ON
    Engine start



OK
Go to step 6
NG


3.CHECK ECM (STAR AND STSW VOLTAGE)


    A162489E21
  1. Measure the voltage between the terminals of the ECM connector and body ground while cranking the engine.

    Standard voltage:
    Tester Connection
    Specified Condition
    NSW (E10-8) - Body ground
    9 to 14 V
    STSW (E11-12) - Body ground
    9 to 14 V


    Result:

    Terminal STAR
    Terminal STSW
    Proceed to
    9 to 14 V
    9 to 14 V
    A
    0 V
    9 to 14 V
    B
    0 V
    0 V
    C



B
REPLACE ECM

C
Go to step 13
A


4.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    A093221E20
  1. Inspect the Park/Neutral Position (PNP) switch.

    1. Disconnect the P1 PNP switch connector.

    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance:
      Shift Position
      Tester Connection
      Specified Condition
      P
      2 - 6, 4 - 5
      Below 1 Ω
      R
      1 - 2
      Below 1 Ω
      N
      2 - 9, 4 - 5
      Below 1 Ω
      D
      2 - 7
      Below 1 Ω
      2
      2 - 3
      Below 1 Ω
      L
      2 - 8
      Below 1 Ω

    3. Reconnect the PNP switch connector.



NG
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY
OK


5.CHECK HARNESS AND CONNECTOR (IGNITION SWITCH - PARK/NEUTRAL POSITION SWITCH)


    A182125E01
  1. Disconnect the I15 ignition switch connector.

  1. Disconnect the P1 park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance (check for open):
    Tester Connection
    Specified Condition
    ST2 (I15-4) - P1-4
    Below 1 Ω

    Standard resistance (check for short):
    Tester Connection
    Specified Condition
    ST2 (I15-4) or P1-4 - Body ground
    10 kΩ or higher

  1. Reconnect the ignition switch connector.

  1. Reconnect the park/neutral position switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH - PARK/NEUTRAL POSITION SWITCH)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM) 

6.INSPECT ST RELAY


    B016200
  1. Remove the ST relay from the No. 3 relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    3 - 5
    10 kΩ or higher
    3 - 5
    Below 1 Ω
    (Apply battery voltage between terminals 1 and 2)

  1. Reinstall the ST relay to the No. 3 relay block.



NG
REPLACE ST RELAY
OK


7.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ST RELAY)


    A166712E01
  1. Disconnect the P1 park/neutral position switch connector.

  1. Remove the ST relay from the No. 3 relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance (check for open):
    Tester Connection
    Specified Condition
    P1-5 - ST relay terminal (1)
    Below 1 Ω

    Standard resistance (check for short):
    Tester Connection
    Specified Condition
    P1-5 or ST relay terminal (1) - Body ground
    10 kΩ or higher

  1. Reconnect the park/neutral position switch connector.

  1. Reinstall the ST relay to the No. 3 relay block.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ST RELAY)
OK


8.CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)


    A166709E01
  1. Remove the ST relay from the No. 3 relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    ST relay terminal (2) - Body ground
    Below 1 Ω

  1. Reinstall the ST relay to the No. 3 relay block.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - BODY GROUND)
OK


9.CHECK ST RELAY (POWER SOURCE)


    A166709E01
  1. Remove the ST relay from the No. 3 relay block.

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Specified Condition
    ST relay terminal (5) - Body ground
    9 to 14 V

  1. Reinstall the ST relay to the No. 3 relay block.



OK
Go to step 11
NG


10.INSPECT FUSIBLE LINK


    A166720E02
  1. Remove the fusible link block from the engine room junction block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    Fusible link
    Below 1 Ω

  1. Reinstall the fusible link block to the engine room junction block.



NG
REPLACE FUSIBLE LINK
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - STARTER RELAY) 

11.INSPECT STARTER ASSEMBLY
  1. Inspect the starter assembly (Click here).



NG
REPLACE STARTER ASSEMBLY
OK


12.CHECK HARNESS AND CONNECTOR (ST RELAY - STARTER ASSEMBLY)


    A166713E01
  1. Remove the ST relay from the No. 3 relay block.

  1. Disconnect the S4 starter connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance (check for open):
    Tester Connection
    Specified Condition
    ST relay terminal (3) - S4-1
    Below 1 Ω

    Standard resistance (check for short):
    Tester Connection
    Specified Condition
    ST relay terminal (3) or S4-1 - Body ground
    10 kΩ or higher

  1. Reconnect the starter connector.

  1. Reinstall the ST relay to the No. 3 relay block.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - STARTER ASSEMBLY)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - STARTER ASSEMBLY) 

13.INSPECT FUSE (ST FUSE)


    A166723E01
  1. Remove the ST fuse from the fuse box.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    1 - 2
    Below 1 Ω

  1. Reinstall the ST fuse.



NG
REPLACE FUSE (ST FUSE)
OK


14.INSPECT IGNITION SWITCH ASSEMBLY


    B050489E19
  1. Disconnect the I15 ignition switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Switch Condition
    Tester Connection
    Specified Condition
    LOCK
    All terminals
    10 kΩ or higher
    ACC
    1 - 3
    Below 1 Ω
    ON
    1 - 2, 1 - 3, 2 - 3, 5 - 6
    Below 1 Ω
    START
    4 - 5, 4 - 6, 5 - 6, 1 - 2
    Below 1 Ω

  1. Reconnect the ignition switch connector.



NG
REPLACE IGNITION SWITCH ASSEMBLY
OK


15.CHECK HARNESS AND CONNECTOR (ECM - IGNITION SWITCH ASSEMBLY)


    A182126E01
  1. Disconnect the E11 ECM connector.

  1. Disconnect the I15 ignition switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance (check for open):
    Tester Connection
    Specified Condition
    STSW (E11-12) - ST2 (I15-4)
    Below 1 Ω

    Standard resistance (check for short):
    Tester Connection
    Specified Condition
    STSW (E11-12) or ST2 (I15-4) - Body ground
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reconnect the ignition switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - IGNITION SWITCH ASSEMBLY)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH - BATTERY)