Use the same procedure for both the LH and RH sides.
The procedure described below is for the LH side.
75552E
1.INSTALL ROOF DRIP SIDE FINISH MOULDING
Install the roof drip side finish moulding clips (1).
Engage the claws (1) to install the roof drip side finish moulding (2).
Install the T20 screws (1) on the roof drip side finish moulding (2).
Connect the front door window frame front moulding.