1.INSPECT CHARCOAL CANISTER SUB-ASSEMBLY
Visually check the charcoal canister sub-assembly.
Visually check the charcoal canister sub-assembly for cracks or damage.
If cracks or damage are found, replace the charcoal canister sub-assembly.
Inspect the ventilation of the charcoal canister sub-assembly.
| *a | Port (A) |
| *b | Port (B) |
| *c | Port (C) |
| *d | Vacuum Pump |
Using a vacuum pump, apply vacuum (2.0 kPa (15 mmHg, 0.59 in.Hg)) to the port (A) with the port (B) and port (C) closed.
Air does not flow.
| *a | Port (A) |
| *b | Port (B) |
| *c | Port (C) |
| *d | Air |
Close the port (C) and apply compressed air 0.5 kPa (0.005 kgf/cm2, 0.1 psi) to the port (A).
Air flows out from the port (B).
| *a | Port (A) |
| *b | Port (B) |
| *c | Port (C) |
| *d | Air |
Apply compressed air 0.5 kPa (0.005 kgf/cm2, 0.1 psi) to the port (A).
Air flows out from the port (B) and port (C).