Home
›
HEATER & AIR CONDITIONING SYSTEM
›
AIR CONDITIONING
›
AIR CONDITIONING CONTROL ASSEMBLY
AIR CONDITIONING CONTROL ASSEMBLY > INSTALLATION
for Preparation
Click here
1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY
Connect the 2 connectors.
Engage the 4 clips and install the air conditioning control assembly.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }
NOTICE:
Refer to PRECAUTION (
Click here
).