REAR PROPELLER SHAFT ASSEMBLY (for Regular Cab 4WD) > REASSEMBLY |
| 1. INSTALL PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING |
![]() |
Apply MP grease No. 2 to a new spider and spider bearing.
Fit the spider into the flange yoke.
![]() |
Measure dimension A between the snap ring grooves.
Insert the thrust washer and spider bearing into the spider journal portion, and then measure dimension B of the universal joint.
![]() |
Select snap rings to make dimensions A and B the same.
| Color | Thickness mm (in.) |
| Green | 1.384 (0.0545) |
| Red | 1.435 (0.0565) |
| Black | 1.486 (0.0585) |
| Copper | 1.511 (0.0595) |
| Silver | 1.537 (0.0605) |
| Yellow | 1.588 (0.0625) |
| Blue | 1.638 (0.0645) |
![]() |
Insert the spider into the yoke, and then using SST, press the spider bearing into the snap ring groove.
Press in the spider bearing on the opposite side in the same way.
![]() |
Using needle-nose pliers, install new snap rings into the grooves of the yoke.
| 2. INSPECT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING |
Check the spider bearings for wear and damage.
Check each spider bearing's axial play by turning the yoke while holding the shaft tightly.