VANE PUMP (for 2TR-FE) > INSPECTION |
| 1. INSPECT OIL CLEARANCE |
![]() |
Using a micrometer and caliper gauge, measure the oil seal clearance.
| 2. INSPECT VANE PUMP ROTOR AND VANE PUMP PLATE |
![]() |
Using a micrometer, measure the height, thickness and length of the vane plates.
![]() |
Using a feeler gauge, measure the clearance between a side face of the vane pump rotor groove and vane plate.
| 3. INSPECT FLOW CONTROL VALVE |
![]() |
Coat the flow control valve with power steering fluid and check that it falls smoothly into the flow control valve hole under its own weight.
![]() |
Check the flow control valve for leakage. Close one of the holes and apply compressed air of 392 to 490 kPa (4 to 5 kgf/cm2, 57 to 71 psi) to the hole on the opposite side. Confirm that the air does not flow out of the end hole.
If necessary, replace the vane pump assembly.
| 4. INSPECT COMPRESSION SPRING |
![]() |
Using vernier calipers, measure the free length of the spring.
| 5. INSPECT PRESSURE PORT UNION SUB-ASSEMBLY |
If the union seat in the pressure port union is badly damaged, it could cause fluid leakage, so replace the vane pump assembly.