Home › ENGINE ยท 2TR-FE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > INSTALLATION

for Preparation Click here



1. INSTALL AIR SWITCHING VALVE ASSEMBLY


G037939E01
  1. Install a new gasket onto the cylinder head.

  1. Install the air switching valve with the 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



    G037938E01
  1. Connect the air switching valve connector.

  1. Connect the vacuum hose.



2. INSTALL INTAKE PIPE INSULATOR


G037937E01
  1. Install 2 new gaskets onto the cylinder head and air switching valve.

  1. Install the intake pipe insulator with the 4 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



3. CONNECT AIR INJECTION SYSTEM NO.1 HOSE


G037936E01
  1. Connect the air injection system No. 1 hose to the air switching valve.



4. INSTALL EXHAUST MANIFOLD HEAT INSULATOR NO.1


G037935E01
  1. Install the exhaust manifold heat insulator No. 1 with the 5 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


G037934E01
  1. Install the air cleaner cap together with the air cleaner hose No. 1.

  1. Connect the 2 air cleaner clamps.

  1. Tighten the hose clamp bolt, then connect the air cleaner hose No. 1.

  1. Connect the wire harness clamp.

  1. Connect the mass air flow meter connector.



6. INSTALL INTAKE AIR CONNECTOR


    G037697E01
  1. Install the intake air connector with the 3 bolts.

    Torque:
    8 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Tighten the 2 hose clamp bolts.

    Torque:
    5 N*m{ 51 kgf*cm , 44 in.*lbf }



    G037696E01
  1. Connect the vacuum hose.



    G037695E01
  1. Connect the ventilation hose No. 2.



    G037694E01
  1. Connect the vacuum hose.

  1. Engage the wire harness clamp.

  1. Connect the pressure sensor connector.



7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }