Home › ENGINE · 2TR-FE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > INSPECTION

for Preparation Click here



1. INSPECT AIR SWITCHING VALVE ASSEMBLY


G037490E01
  1. Check the resistance.

    1. Using an ohmmeter, measure the resistance between the terminals.

      Resistance:
      4.5 to 5.5 Ω at 20°C (68°F)

      If the result is not as specified, replace the air switching valve.



    G037942E01
  1. Check the operation.

    1. Check that air does not flow from the port.



    2. G037943E01
    3. Apply battery positive voltage across the terminals.

    4. Check that air flows from the port.
      If the operation is not as specified, replace the air switching valve.