INPUT SHAFT > REASSEMBLY |
| 1. INSTALL INPUT SHAFT FRONT BEARING |
![]() |
Using SST and a press, install a new input shaft front bearing FR onto the input shaft.
| 2. INSTALL FRONT BEARING SHAFT SNAP RING |
![]() |
Select the correct input shaft front bearing snap ring so that the clearance between the input shaft and input shaft front bearing is within the specified values.
| Mark | Thickness mm (in.) |
| A | 2.10 to 2.15 (0.0827 to 0.0846) |
| B | 2.15 to 2.20 (0.0846 to 0.0866) |
| C | 2.20 to 2.25 (0.0866 to 0.0886) |
| D | 2.25 to 2.30 (0.0886 to 0.0906) |
| E | 2.30 to 2.35 (0.0906 to 0.0925) |
| F | 2.35 to 2.40 (0.0925 to 0.0945) |
| G | 2.40 to 2.45 (0.0945 to 0.0965) |
| 3. INSTALL INPUT SHAFT BEARING |
![]() |
Apply gear oil to the input shaft bearing and install it onto the input shaft.
| 4. INSTALL NO. 2 SYNCHRONIZER RING |
![]() |
Apply gear oil to synchronizer ring No. 2, and install it onto the input shaft.