Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › DUTY VACUUM SWITCHING VALVE

DUTY VACUUM SWITCHING VALVE > INSTALLATION

for Preparation Click here



1. INSTALL DUTY VACUUM SWITCHING VALVE
  1. Connect the hose to the vacuum switching valve.

  1. Install the vacuum switching valve with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the vapor feed hose.

  1. Connect the connector.



2. INSTALL V-BANK COVER
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }