Home › ENGINE ยท 1GR-FE › ENGINE MECHANICAL › VALVE CLEARANCE

VALVE CLEARANCE > ADJUSTMENT

for Preparation Click here



1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL


2. DRAIN ENGINE COOLANT


A070279E01

CAUTION:
To avoid the danger of being burned, do not remove the radiator cap while the engine and radiator are still hot. Thermal expansion will cause hot engine coolant and steam to blow out from the radiator.

  1. Remove the service hole cover from the engine under cover.

  1. Install a vinyl hose onto the drain on the radiator side.

  1. Fix the vinyl hose with tape.



    A076320E02
  1. Loosen the 3 drain plugs on the engine and radiator, and drain the coolant.

  1. Remove the radiator cap.

  1. Drain the coolant from the reservoir tank.

  1. Tighten the 3 drain plugs.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf } for the engine

  1. Remove the vinyl hose from the radiator.



3. REMOVE V-BANK COVER


A075593E01
  1. Remove the 2 nuts, then remove the V-bank cover.



4. REMOVE AIR CLEANER ASSEMBLY


A075594E01
  1. Disconnect the ventilation hose No. 2.



    A075595E01
  1. Disconnect the vacuum hose.

  1. Disconnect the mass air flow meter connector.

  1. Remove the 2 wire harness clamps.



    A075596E01
  1. Loosen the 2 hose clamps.

  1. Remove the 2 bolts, then remove the air cleaner.



5. REMOVE INTAKE AIR SURGE TANK


A076500E02
  1. Disconnect the 2 water by-pass hoses.



    A075644E01
  1. Disconnect the fuel vapor feed hose.



    A075645E01
  1. Disconnect the ventilation hose.



    A075646E01
  1. Disconnect the 2 VSV connectors.

  1. Disconnect the throttle body with motor connector.

  1. Separate the 3 wire harness clamps and hose clamp.



    G036170E01
  1. Remove the nut, then separate the clutch flexible hose bracket from the surge tank stay (with Manual Transmission).



    A076501E01
  1. Remove the 2 bolts and throttle body bracket.



    A076502E01
  1. Remove the bolt and oil baffle plate.

  1. Remove the 4 bolts and 2 surge tank stays.



    A075648E02
  1. Remove the 2 nuts.

  1. Using a socket hexagon wrench 8, remove the 4 bolts, intake air surge tank and gasket.



6. REMOVE IGNITION COIL ASSEMBLY


G036133E01
  1. Disconnect the 6 connectors.

  1. Remove the 6 bolts, then remove the 6 ignition coils.



7. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY


A072943E01
  1. Remove the 10 bolts, 3 seal washers, 2 nuts, cylinder head cover and gasket.



8. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY LH


A076503E01
  1. Remove the 10 bolts, 3 seal washers, 2 nuts, cylinder head cover and gasket.



9. SET NO.1 CYLINDER TO TDC/COMPRESSION


A076530E02
  1. Turn the crankshaft pulley until its groove and the timing mark "0" of the timing chain cover are aligned.



    G036289E01
  1. Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration.
    If not, turn the crankshaft 1 complete revolution (360°) and align the timing marks above.



10. INSPECT VALVE CLEARANCE


A076343E01
  1. Check the valves indicated in the illustration.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Valve clearance (Cold):
      Intake 0.15 to 0.25 mm (0.006 to 0.010 in.)
      Exhaust 0.29 to 0.39 mm (0.011 to 0.015 in.)

    2. Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.



    A076344E01
  1. Turn the crankshaft 240° clockwise, and check the valves indicated in the illustration.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Valve clearance (Cold):
      Intake 0.15 to 0.25 mm (0.006 to 0.010 in.)
      Exhaust 0.29 to 0.39 mm (0.011 to 0.015 in.)

    2. Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.



    A076345E02
  1. Turn the crankshaft 240° clockwise, and check the valves indicated in the illustration.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

    2. Valve clearance (Cold):
      Intake 0.15 to 0.25 mm (0.006 to 0.010 in.)
      Exhaust 0.29 to 0.39 mm (0.011 to 0.015 in.)

      Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.



11. ADJUST VALVE CLEARANCE


A076530E02


  1. Set No. 1 cylinder to TDC/compression.

    1. Turn the crankshaft pulley until its groove and the timing mark "0" of the timing chain cover are aligned.



    2. G036289E01
    3. Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration.
      If not, turn the crankshaft 1 complete revolution (360°) and align the timing marks as above.



    4. G036271E01
    5. Place paint marks on the No. 1 chain links corresponding to the timing marks of the camshaft timing gears.

  1. Remove the chain tensioner assembly No. 1.

  1. Remove the No. 2 camshaft.

  1. Remove the chain tensioner assembly No. 2.

  1. Remove the camshaft.

  1. Remove the No. 4 camshaft sub-assembly.

  1. Remove the chain tensioner assembly No. 3.

  1. Remove the No. 3 camshaft sub-assembly.

  1. Remove the valve lifters.



    A001082E01
  1. Determine the replacement valve lifter size according to the following formulas and charts:

    1. Using a micrometer, measure the thickness of the removed lifter.

    2. Calculate the thickness of a new lifter so that the valve clearance comes within the specified value.

      T:
      Thickness of removed lifter

      A:
      Measured valve clearance

      N:
      Thickness of new lifter

      Intake:
      N = T + (A - 0.20 mm (0.008 in.))

      Exhaust:
      N = T + (A - 0.30 mm (0.012 in.))



    3. Select a new lifter with a thickness as close as possible to the calculated value.

      HINT:
      Lifters are available in 35 sizes in increments of 0.020 mm (0.0008 in.), from 5.060 mm (0.1992 in.) to 5.740 mm (0.2260 in.).



      A076341



      A076342

  1. Install the No. 3 camshaft sub-assembly.

  1. Install the chain tensioner assembly No. 3.

  1. Install the No. 4 camshaft sub-assembly.

  1. Install the camshaft.

  1. Install the chain tensioner assembly No. 2.

  1. Install the No. 2 camshaft.



  1. Install the chain tensioner assembly No. 1.



      G036288E01
    1. Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration.



12. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.



    A076311E02
  1. Install the cylinder head cover within 3 minutes of applying seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing mush be removed and reapplied.

    Seal packing:
    Part No. 08826-00080 or equivalent

    NOTICE:
    Install the cylinder head cover within 3 minutes after applying the seal packing. After installing it, cylinder head cover bolts and nuts must be tightened within 15 minutes. Otherwise the seal packing must be removed and reapplied.

  1. Install the seal washers onto the bolts.



    A076503E03
  1. Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    10 N*m{ 102 kgf*cm , 7.4 ft.*lbf } for bolt A
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf } for bolt B
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf } for nut

    HINT:
    Each bolt length is as follows.
    Bolt
    Length
    A
    25 mm (0.98 in.)
    B
    60 mm (2.36 in.)



13. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.



    A076310E02
  1. Apply a continuous bead of seal packing (diameter 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    NOTICE:
    Install the cylinder head cover within 3 minutes of applying the seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing must be removed and reapplied.

  1. Install the seal washers onto the bolts.



    A072943E03
  1. Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

    Torque:
    10 N*m{ 102 kgf*cm , 7.4 ft.*lbf } for bolt A
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf } for bolt B
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf } for nut

    HINT:
    Each bolt length is as follows.
    Bolt
    Length
    A
    25 mm (0.98 in.)
    B
    60 mm (2.36 in.)



14. INSTALL IGNITION COIL ASSEMBLY

Torque:
10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }



15. INSTALL INTAKE AIR SURGE TANK
  1. Install a new gasket onto the intake air surge tank.

  1. Using the socket hexagon wrench 8, install the intake air surge tank with the 4 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Install the 2 intake air surge tank nuts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Install the 2 surge tank stays with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the oil baffle plate with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install the throttle body bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the clutch flexible hose bracket with the nut (w/ Manual Transmission).

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

  1. Install the 3 wire harness clamps and hose clamp.

  1. Connect the throttle body w/ motor connector.

  1. Connect the 2 VSV connectors.

  1. Connect the ventilation hose.

  1. Connect the fuel vapor feed hose.

  1. Connect the 2 water by-pass hoses.



16. INSTALL AIR CLEANER ASSEMBLY
  1. Install the air cleaner with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the ventilation hose No. 2.



17. ADD ENGINE COOLANT
  1. Pour coolant into the radiator until it overflows.

    Capacity:

    Transmission
    Capacity
    Manual Transmission
    9.7 liters (10.3 Us qts, 8.5 Imp. qts)
    Automatic Transmission
    9.8 liters (10.4 Us qts, 8.6 Imp. qts)

    HINT:
    1. Use of improper coolants may damage the engine cooling system.
    2. Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    3. New Toyota vehicles are filled with Toyota Super Long Life Coolant (color is pink, premixed ethylene glycol concentration is approximately 50 % and freezing temperature is -35°C (-31°F)). When replacing the coolant, Toyota Super Long Life Coolant is recommended.

    NOTICE:
    Do not substitute plain water for engine coolant.

  1. Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.

  1. Install the radiator cap securely.

  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Warm up the engine until the cooling fan operates.

    1. Set the air conditioning as follows while warming up the engine.

      Item
      Condition
      Fan Speed
      Any setting except OFF
      Temperature
      Toward WARM
      Air Conditioning Switch
      OFF

    2. Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.

  1. Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine.

  1. Stop the engine and wait until the coolant cools down.

  1. Remove the radiator cap and check the coolant level inside the radiator.

  1. If the coolant level is below the full level, perform the steps from (a) through (h) and repeat the operation until the coolant level remains at the full level.

  1. Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.



18. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


19. CHECK FOR ENGINE COOLANT LEAKAGE
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Pump it to 118 kPa (1.2 kgf/cm2 17.1 psi), then check for leakage.



20. INSTALL V-BANK COVER
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



21. INSPECT IGNITION TIMING

NOTICE:
  1. Turn all electrical systems OFF.
  1. Operate the inspection when the cooling fan motor is turned OFF.

  1. Warm up the engine.



    G035612E02
  1. When using the intelligent tester.

    1. Connect the intelligent tester to the DLC3.

    2. Select the following menu items: DIAGNOSIS / ENHANCED OBD ll / DATA LIST / IGN ADVANCE.

    3. Inspect the ignition timing during idling.

      Ignition timing:
      7 to 24°CA BTDC during idling (Transmission in neutral position)

    4. Check that the ignition timing advances immediately when the engine speed is increased.



    A118802E01
  1. When not using intelligent tester.

    1. Using SST, connect the terminals 13 (TC) and 4 (CG) of the DLC3.

      SST
      09843-18040  

      NOTICE:
      Be sure not to connect the terminals wrongly. It causes breakage of the engine.

    2. Remove the air cleaner.



    3. A076315E02
    4. Pull out the wire harness as shown in the illustration.

    5. Connect the tester probe of a timing light to the wire of the ignition coil connector for No. 1 cylinder.

      NOTICE:
      1. Use a timing light that detects the first signal.
      1. After checking, be sure to wrap the wire harness with tape.



    6. A076316E01
    7. Inspect the ignition timing during idling.

      Ignition timing:
      8 to 12°CA BTDC during idling (Transmission in neutral position)

    8. Remove the SST from the DLC3.

    9. Inspect the ignition timing during idling.

      Ignition timing:
      7 to 24°CA BTDC during idling (Transmission in neutral position)

    10. Install the air cleaner.