Home › ENGINE · 1GR-FE › ENGINE CONTROL SYSTEM › KNOCK SENSOR (for 2WD)

KNOCK SENSOR (for 2WD) > INSTALLATION

for Preparation Click here



1. INSTALL KNOCK SENSOR


A078438E02
  1. Install the 2 knock sensors with the 2 bolts as shown in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 knock sensor connectors.



2. INSTALL WATER OUTLET PIPE NO.1
  1. Install the water outlet pipe with the 3 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install the 4 wire harness clamps.



3. CONNECT HEATER WATER INLET HOSE


4. INSPECT CYLINDER HEAD SET BOLT


A076820E01
  1. Using vernier calipers, measure the outside diameter of the bolt thread.

    Standard outside diameter:
    10.85 to 11.00 mm (0.4272 to 0.4331 in.)

    Minimum outside diameter:
    10.7 mm (0.421 in.)



5. INSTALL CYLINDER HEAD SUB-ASSEMBLY
  1. Place the cylinder head on the cylinder head gasket.



  1. Install the 8 cylinder head bolts.

    HINT:
    1. The cylinder head bolts are tightened in 2 successive steps (steps (3) and (5)).
    2. If any cylinder head bolts are broken or deformed, replace them.


    1. Apply a light coat of engine oil to the threads of the cylinder head bolts.

    2. Install the plate washer onto the cylinder head bolt.



    3. A076273E02
    4. Using several steps, tighten each bolt uniformly with a 10 mm bi-hexagon wrench in the sequence shown in the illustration.

      Torque:
      36 N*m{ 367 kgf*cm , 27 ft.*lbf }

      If any cylinder head bolts do not meet the torque specification, replace them.

      NOTICE:
      Do not drop the washers into the cylinder head.



    5. A076274E02
    6. Mark the front side of each cylinder head bolt with paint.

    7. Retighten the cylinder head bolts 180° as shown.

    8. Check that the painted marks are now at 180° from the engine front.

  1. Install the ground cables with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



6. INSTALL CAMSHAFT BEARING NO.2


7. INSTALL CAMSHAFTS

NOTICE:
Keep the camshaft level while it is being removed. The camshaft thrust clearance is very small and failing to keep it level could crack or damage the cylinder head journal surface, which receives the thrust. This could subsequently lead the camshaft to seize or break. Perform the following steps to avoid such problems.



    A076280E02
  1. Set the crankshaft position.

    1. Using the crankshaft pulley set bolt, turn the crankshaft, and set the crankshaft set key in the left horizontal position.

      NOTICE:
      Installing the crankshaft at the wrong angle could cause the piston head and valve head to come into contact with each other when installing the camshaft. This could cause damage, so always set the crankshaft at the correct angle.

  1. Apply new engine oil to the thrust portion and journal of the camshafts.



    A076281E03
  1. Place the 2 camshafts onto the cylinder head with the cam lobes of No. 1 cylinder facing in the directions shown in the illustration.



    A076282E03
  1. Install the 8 bearing caps in the proper locations as shown.

  1. Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts.



    A072967E06
  1. Using several steps, uniformly install and tighten the 16 bearing cap bolts in the sequence shown in the illustration.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf } for 10 mm (0.39 in.) head
    24 N*m{ 245 kgf*cm , 18 ft.*lbf } for 12 mm (0.47 in.) head



    A076283E02
  1. Turn the camshafts clockwise until each camshaft knock pin comes to a position 90° to the cylinder head.



8. INSTALL CHAIN TENSIONER ASSEMBLY NO.2


A076286E01
  1. While pushing in the tensioner, insert a pin of φ 1.0 mm (0.039 in.) into the hole to fix it.



    A072962E01
  1. Install the chain tensioner No. 2 with the bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }



9. INSTALL CAMSHAFT TIMING GEARS AND NO.2 CHAIN (RH BANK)


A076287E03
  1. Align the yellow mark links with the timing marks (1 dot mark) of camshaft timing gears as shown in the illustration.



    G036257E01
  1. Align the timing marks on the camshaft timing gears with the timing marks on the bearing caps, and install the camshaft timing gears with the chain onto the RH camshafts.

  1. Temporarily install the 2 camshaft timing gear bolts.

    NOTICE:
    Do not push camshaft timing gear assembly onto the camshaft forcibly when installing it.



    G036252E01
  1. Hold the hexagonal portion of the camshaft with a wrench, and tighten the 2 bolts.

    Torque:
    100 N*m{ 1,020 kgf*cm , 74 ft.*lbf }

  1. Remove the pin from the tensioner No. 2.



10. INSTALL CHAIN VIBRATION DAMPER NO.1


A076292E01
  1. Install the chain vibration damper with the 2 bolts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }



11. INSTALL WATER BY-PASS JOINT REAR


A076535E01
  1. Install a new O-ring onto the water outlet pipe.

  1. Apply soapy water to the O-ring.

  1. Install 2 new gaskets and water by-pass joint rear with the 2 bolts and 4 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the heater hose.

  1. Connect the engine coolant temperature sensor connector.



12. INSTALL INTAKE MANIFOLD


A076536E01
  1. Set a new gasket on each cylinder head.

    NOTICE:
    1. Align the port holes of the gasket and cylinder head.
    2. Be careful of the installation direction.

  1. Set the intake manifold on the cylinder heads.

  1. Install and tighten the 10 bolts uniformly in several steps.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }

  1. Connect the 6 fuel injector connectors.



13. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH


A076536E01
  1. Set a new gasket on each cylinder head.

    NOTICE:
    1. Align the port holes of the gasket and cylinder head.
    2. Be careful of the installation direction.

  1. Set the intake manifold on the cylinder heads.

  1. Install and tighten the 10 bolts uniformly in several steps.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }

  1. Connect the 6 fuel injector connectors.



14. INSTALL MANIFOLD STAY
  1. Install the manifold stay with the 3 bolts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }



15. INSTALL EXHAUST PIPE ASSEMBLY FRONT
  1. Install a new gasket onto the exhaust manifold RH.

  1. Install the exhaust front pipe with the new 2 nuts.

    Torque:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf }



16. INSTALL EXHAUST FRONT PIPE ASSEMBLY NO.2
  1. Install a new gasket onto the exhaust manifold LH.

  1. Install a new gasket onto the exhaust front pipe.

  1. Install the exhaust front pipe No. 2 onto the insulator.

  1. Install the exhaust front pipe No. 2 onto the exhaust manifold LH with the new 2 nuts.

    Torque:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf }

  1. Install the exhaust front pipe No. 2 onto the exhaust front pipe with the 2 bolts and 2 nuts.

    Torque:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }



    G036129E02
  1. Install a new gasket onto the exhaust front pipe No. 2.

    1. Using a wooden block and plastic- faced hammer, tap in a new gasket until it is flush with the exhaust front pipe No. 2.

      NOTICE:
      1. Make sure that the gasket is in the correct direction when installing.
      2. Do not reuse the removed gasket.



17. INSTALL COOL AIR INLET NO.1
  1. Install the cool air inlet with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9.0 ft.*lbf }



18. INSTALL CHAIN TENSIONER SLIPPER


19. INSTALL CHAIN TENSIONER ASSEMBLY NO.1


A076294E02
  1. While turning the stopper plate of the tensioner clockwise, push in the plunger of the tensioner as shown in the illustration.

  1. While turning the stopper plate of the tensioner counterclockwise, insert a bar of φ 35 mm (0.138 in.) into the holes in the stopper plate and tensioner to fix the stopper plate.

  1. Install the chain tensioner with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }



20. INSTALL CHAIN SUB-ASSEMBLY


G036290E03


  1. Set the No. 1 cylinder to TDC/ compression.

    1. Align the timing marks of the camshaft timing gears and bearing caps.



    2. A076296E02
    3. Using the crankshaft pulley set bolt, turn the crankshaft to align the crankshaft set key with the timing line of the cylinder block.



    A076297E03
  1. Align the yellow mark link with the timing mark of the crankshaft timing link.



    G036259E02
  1. Align the orange mark links with the timing marks of the camshaft timing gears, and install the chain.



21. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY
(Click here)


22. INSTALL ENGINE ASSEMBLY
(Click here)


23. INSTALL BATTERY


24. ADD ENGINE COOLANT
  1. Pour coolant into the radiator until it overflows.

    Capacity:

    Transmission
    Capacity
    Manual Transmission
    9.7 liters (10.3 Us qts, 8.5 Imp. qts)
    Automatic Transmission
    9.8 liters (10.4 Us qts, 8.6 Imp. qts)

    HINT:
    1. Use of improper coolants may damage the engine cooling system.
    2. Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    3. New Toyota vehicles are filled with Toyota Super Long Life Coolant (color is pink, premixed ethylene glycol concentration is approximately 50 % and freezing temperature is -35°C (-31°F)). When replacing the coolant, Toyota Super Long Life Coolant is recommended.

    NOTICE:
    Do not substitute plain water for engine coolant.

  1. Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.

  1. Install the radiator cap securely.

  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Warm up the engine until the cooling fan operates.

    1. Set the air conditioning as follows while warming up the engine.

      Item
      Condition
      Fan Speed
      Any setting except OFF
      Temperature
      Toward WARM
      Air Conditioning Switch
      OFF

    2. Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.

  1. Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine.

  1. Stop the engine and wait until the coolant cools down.

  1. Remove the radiator cap and check the coolant level inside the radiator.

  1. If the coolant level is below the full level, perform the steps from (a) through (h) and repeat the operation until the coolant level remains at the full level.

  1. Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.



25. ADD ENGINE OIL
  1. Fill with fresh engine oil.

    Standard engine oil:

    Oil grade
    Oil viscosity (SAE)
    ILSAC multigrade engine oil
    5W-30


    Standard capacity (for 2WD):

    Item
    Specified Condition
    Drain and refill with oil filter change
    4.5 liters (4.8 US qts, 4.0 lmp. qts)
    Drain and refill without oil filter change
    4.2 liters (4.4 US qts, 3.7 lmp. qts)
    Dry fill
    5.6 liters (5.9 US qts, 4.9 lmp. qts)


    Standard capacity (for PRE RUNNER and 4WD):

    Item
    Specified Condition
    Drain and refill with oil filter change
    5.2 liters (5.5 US qts, 4.6 lmp. qts)
    Drain and refill without oil filter change
    4.9 liters (5.2 US qts, 4.3 lmp. qts)
    Dry fill
    6.0 liters (6.3 US qts, 5.3 lmp. qts)

  1. Reinstall the oil filler cap.



26. CHECK FOR ENGINE COOLANT LEAKAGE
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Pump it to 118 kPa (1.2 kgf/cm2 17.1 psi), then check for leakage.



27. CHECK FOR ENGINE OIL LEAKAGE


28. CHECK FOR FUEL LEAKAGE


29. CHECK FOR EXHAUST GAS LEAKAGE


30. INSPECT IGNITION TIMING

NOTICE:
  1. Turn all electrical systems OFF.
  1. Operate the inspection when the cooling fan motor is turned OFF.

  1. Warm up the engine.

  1. When using the Techstream.

    1. Connect the Techstream to the DLC3.

    2. Enter the following menu items:
      Select: Powertrain / Engine and ECT / Data List / IGN Advance.

    3. Inspect the ignition timing during idling.

      Ignition timing:
      7 to 24° BTDC @ idle (Transmission in neutral position)

    4. Check that the ignition timing advances immediately when the engine speed is increased.



    A118802E01
  1. When not using Techstream.

    1. Using SST, connect the terminals 13 (TC) and 4 (CG) of the DLC3.

      SST
      09843-18040  

      NOTICE:
      Be sure not to connect the terminals wrongly. It causes breakage of the engine.

    2. Remove the air cleaner.



    3. A076315E02
    4. Pull out the wire harness as shown in the illustration.

    5. Connect the tester probe of a timing light to the wire of the ignition coil connector for No. 1 cylinder.

      NOTICE:
      1. Use a timing light that detects the first signal.
      1. After checking, be sure to wrap the wire harness with tape.



    6. A076316E01
    7. Inspect the ignition timing during idling.

      Ignition timing:
      8 to 12° BTDC @ idle (Transmission in neutral position)

    8. Remove the SST from the DLC3.

    9. Inspect the ignition timing during idling.

      Ignition timing:
      7 to 24° BTDC @ idle (Transmission in neutral position)

    10. Install the air cleaner.



31. INSPECT ENGINE IDLING SPEED

NOTICE:
  1. Turn all the electrical systems OFF.
  1. Operate the inspection when the cooling fan motor is turned OFF.

  1. Warm up the engine.

  1. When using the Techstream:

    1. Connect the Techstream to the DLC3.

    2. Enter the following menu items:
      Select: Powertrain / Engine and ECT / Data List / Engine Speed.

    3. Inspect the engine idling speed.

      Idling speed:
      650 to 750 rpm (Transmission in neutral position)



    A118802E02
  1. When not using the Techstream:

    1. Using SST, connect the terminal 8 (TAC) of the DLC3.

      SST
      09843-18030  

    2. Race the engine speed at 2,500 rpm for approximately 90 seconds.

    3. Inspect the engine idling speed.

      Idling speed:
      650 to 750 rpm (Transmission in neutral position)



32. INSPECT CO/HC
  1. Start the engine.

  1. Run the engine at 2,500 rpm for approximately 180 seconds.

  1. Insert the CO/HC meter testing probe at least 40 cm (1.3 ft) into the tailpipe during idling.

  1. Immediately check the CO/HC concentration during idling and/or at 2,500 rpm.

    HINT:
    1. Complete the measurement within 3 minutes.
    1. When carrying out the 2 modes (idling and 2,500 rpm) test, the measurement orders are prescribed by the applicable local regulations.

  1. If the CO/HC concentration does not comply with regulations, troubleshoot in the order given below.

    1. Check the heated oxygen sensor operation.

      CO
      HC
      Problems
      Causes
      Normal
      High
      Rough idling
      1. Faulty ignition:
        1. Incorrect timing
        1. Fouled, shorted or improperly gapped plugs
      2. Incorrect valve clearance
      3. Leaky intake and exhaust valves
      4. Leaky cylinders
      Low
      High
      Rough idling
      (Fluctuating HC reading)
      1. Vacuum leaks:
        1. PCV hoses
        1. Intake manifold
        1. Throttle body
        1. IAC valve
        1. Brake booster line
      2. Lean mixture causing misfire
      High
      High
      Rough idling
      (Black smoke from exhaust)
      1. Restricted air filter
      2. Plugged PCV valve
      3. Faulty EFI systems:
        1. Faulty pressure regulator
        1. Faulty engine coolant temperature sensor
        1. Faulty mass air flow meter
        1. Faulty ECM
        1. Faulty injectors
        1. Faulty throttle position sensor