Home › BODY › EXTERIOR › ROOF DRIP SIDE FINISH MOULDING

ROOF DRIP SIDE FINISH MOULDING > INSTALLATION

for Preparation Click here



1. INSTALL ROOF DRIP SIDE FINISH MOULDING

NOTICE:
  1. If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.
  2. If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.

HINT:
Use the following steps (a) to (d) only when replacing the clips.



    B212891E01
  1. Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.

    HINT:
    Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2) or more (when the temperature is 23°C (73°F) )

  1. Press and install the 2 roof drip side finish moulding clips.



    B212892E01
  1. Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent).

    Specification:
    Dimension
    Measurement
    a
    13.2 mm (0.520 in.)
    b
    12.7 mm (0.500 in.)

  1. Install the roof drip side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.

    HINT:
    1. Initial hardening time: 20 minutes
    2. Complete hardening time: 48 hours



    B087512E02
  1. Engage the 2 clips and install the roof drip side finish moulding.