Home › ENGINE · 1GR-FE › INTAKE › INTAKE SYSTEM

INTAKE SYSTEM > INSPECTION

for Preparation Click here



1. INSPECT INTAKE AIR SURGE TANK


A075984E02
  1. Inspect the diaphragm.

    1. Check that the lever moves when a vacuum of 26.6 kPa (200 mmHg) is applied with the Vacuum gage on.

    2. Check that the vacuum of 26.6 kPa (200 mmHg) is sustained for 1 minute in the above state.



2. INSPECT NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


G036152E01
  1. Check the resistance.

    1. Using an ohmmeter, measure the resistance between the terminals.

      Standard:
      Tester Connection
      Specified Condition
      1 - 2
      37 to 44 Ω at 20°C (68°F)

      If the result is not as specified, replace the vacuum switching valve No. 1.



    G036153E01
  1. Check the vacuum switching valve No. 1 for ground.

    1. Using an ohmmeter, measure the resistance between each terminal and the body.

      Standard:
      Tester Connection
      Specified Condition
      1 - Body
      10 kΩ or higher
      2 - Body
      10 kΩ or higher

      If the result is not as specified, replace the vacuum switching valve No. 1.



    FI06393E01
  1. Check the operation.

    1. Check that air does not flow from port E to port F.
      If the operation is not as specified, replace the vacuum switching valve No. 1.



    2. S004523E01
    3. Apply battery voltage across the terminals.

    4. Check that air flows from port E to port F.
      If the operation is not as specified, replace the vacuum switching valve No. 1.