INTAKE SYSTEM > INSPECTION |
| 1. INSPECT INTAKE AIR SURGE TANK |
![]() |
Inspect the diaphragm.
Check that the lever moves when a vacuum of 26.6 kPa (200 mmHg) is applied with the Vacuum gage on.
Check that the vacuum of 26.6 kPa (200 mmHg) is sustained for 1 minute in the above state.
| 2. INSPECT NO. 1 VACUUM SWITCHING VALVE ASSEMBLY |
![]() |
Check the resistance.
Using an ohmmeter, measure the resistance between the terminals.
| Tester Connection | Specified Condition |
| 1 - 2 | 37 to 44 Ω at 20°C (68°F) |
![]() |
Check the vacuum switching valve No. 1 for ground.
Using an ohmmeter, measure the resistance between each terminal and the body.
| Tester Connection | Specified Condition |
| 1 - Body | 10 kΩ or higher |
| 2 - Body | 10 kΩ or higher |
![]() |
Check the operation.
Check that air does not flow from port E to port F.
If the operation is not as specified, replace the vacuum switching valve No. 1.
![]() |
Apply battery voltage across the terminals.
Check that air flows from port E to port F.
If the operation is not as specified, replace the vacuum switching valve No. 1.