Home › ENGINE · 2TR-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSPECTION

for Preparation Click here



1. INSPECT PURGE VSV


    G036146E01
  1. Check the resistance.

    1. Using an ohmmeter, measure the resistance between the terminals.

      Standard:
      Tester Connection
      Specified Condition
      1 - 2
      26 to 30 Ω at 20°C (68°F)

      If the result is not as specified, replace the purge VSV.



    G036147E01
  1. Check the vacuum switching valve No. 1 for ground.

    1. Using an ohmmeter, check the resistance between each terminal and the body.

      Standard:
      Tester Connection
      Specified Condition
      1 - Body
      10 MΩ or higher
      2 - Body
      10 MΩ or higher

      If the result is not as specified, replace the purge VSV.



    A076688E03
  1. Check the operation.

    1. Check that air does not flow from port E to port F.
      If the operation is not as specified, replace the purge VSV.



    2. A076689E04
    3. Apply battery voltage across the terminals.

    4. Check that air flows from port E to port F.
      If the operation is not as specified, replace the purge VSV.