Home › ENGINE ยท 1GR-FE › STARTING › STARTER (for 2WD and Pre-Runner)

STARTER (for 2WD and Pre-Runner) > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY
  1. Install the starter assembly with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Install the wire harness with the nut to terminal 30.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }

  1. Connect terminal 50 to the starter assembly.



2. INSTALL WIRE HARNESS
  1. Install the earth wire harness onto the cylinder block with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



3. INSTALL NO.2 MANIFOLD STAY
  1. Install the manifold stay No. 2 with the 3 bolts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }



4. INSTALL NO.1 ENGINE UNDER COVER SUB-ASSEMBLY (for Off Road Package)
  1. Install the engine under cover with the 4 bolts.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }