TIMING CHAIN (for 2WD) > INSTALLATION |
| 1. INSTALL CHAIN TENSIONER SLIPPER |
| 2. INSTALL NO.1 CHAIN TENSIONER ASSEMBLY |
![]() |
While turning the stopper plate of the tensioner clockwise, push in the plunger of the tensioner as shown in the illustration.
While turning the stopper plate of the tensioner counterclockwise, insert a bar of φ 35 mm (0.138 in.) into the holes in the stopper plate and tensioner to fix the stopper plate.
Install the chain tensioner with the 2 bolts.
| 3. INSTALL CHAIN SUB-ASSEMBLY |
![]() |
Set the No. 1 cylinder to TDC/ compression.
Align the timing marks of the camshaft timing gears and bearing caps.
![]() |
Using the crankshaft pulley set bolt, turn the crankshaft to align the crankshaft set key with the timing line of the cylinder block.
![]() |
Align the yellow mark link with the timing mark of the crankshaft timing link.
![]() |
Align the orange mark links with the timing marks of the camshaft timing gears, and install the chain.
| 4. INSTALL NO.2 CHAIN VIBRATION DAMPER |
Install the 2 chain vibration dampers No. 2.
| 5. INSTALL IDLE SPROCKET ASSEMBLY |
Apply a light coat of engine oil to rotating surface of the idle gear shaft No. 1.
![]() |
Temporarily install the idle gear shaft No. 1 together with idle gear shaft No. 2 while aligning the knock pin of the idle gear shaft No. 1 with the knock pin groove of the cylinder block.
Using 10 mm hexagon wrench, tighten the idle gear shaft No. 2.
Remove the bar from the chain tensioner.
| 6. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL |
![]() |
Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing chain cover edge.
Apply MP grease to the oil seal lip.
| 7. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY |
Remove any old packing (FIPG) material. Be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.
![]() |
Install a new O-ring onto the LH cylinder head as shown in the illustration.
![]() |
Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the 4 locations shown in the illustration.
![]() |
Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the timing chain cover as shown in the illustration.
![]() |
Align the key way of the oil pump drive rotor with the rectangular portion of the crankshaft timing gear, and slide the timing chain cover into place.
![]() |
Install the timing chain cover with the 24 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 55 mm (2.17 in.) |
| 8. INSTALL VVT SENSOR |
LH bank side VVT sensor:
Apply a light coat of engine oil to the O-ring of the VVT sensor.
Install the VVT sensor with the bolt.
Connect the VVT sensor connector.
Connect the water by-pass hoses No. 4 and No. 5.
RH bank side VVT sensor:
Apply a light coat of engine oil to the O-ring of the VVT sensor.
Install the VVT sensor with the bolt.
Connect the VVT sensor connector.
| 9. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
Install the 2 camshaft timing oil control valves with the 2 bolts.
Connect the 2 connectors.
| 10. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
![]() |
Install the cylinder head cover within 3 minutes of applying seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing mush be removed and reapplied.
Install the seal washers onto the bolts.
![]() |
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 60 mm (2.36 in.) |
| 11. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
![]() |
Apply a continuous bead of seal packing (diameter 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.
Install the seal washers onto the bolts.
![]() |
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 60 mm (2.36 in.) |
| 12. INSTALL IGNITION COIL ASSEMBLY |
Install the 6 ignition coils with the 6 bolts.
Connect the 6 ignition coil connectors.
| 13. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket onto the intake air surge tank.
Using the socket hexagon wrench 8, install the intake air surge tank with the 4 bolts.
Install the 2 intake air surge tank nuts.
Install the 2 surge tank stays with the 4 bolts.
Install the oil baffle plate with the bolt.
Install the throttle body bracket with the 2 bolts.
Install the clutch flexible hose bracket with the nut (w/ Manual Transmission).
Install the 3 wire harness clamps and hose clamp.
Connect the throttle body w/ motor connector.
Connect the 2 VSV connectors.
Connect the ventilation hose.
Connect the fuel vapor feed hose.
Connect the 2 water by-pass hoses.
| 14. INSTALL OIL PAN SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the cylinder block, rear oil seal retainer and oil pan.
![]() |
Install a new O-ring onto the oil pump.
![]() |
Apply a continuous bead of the seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the oil pan as shown in the illustration.
![]() |
Install the oil pan with the 17 bolts and 2 nuts, and tighten the bolts and nuts uniformly in several steps.
| Bolt | Length |
| A | 25 mm (0.98 in.) |
| B | 45 mm (1.77 in.) |
| C | 14 mm (0.55 in.) |
| 15. INSTALL OIL STRAINER SUB-ASSEMBLY |
![]() |
Install a new gasket and the oil strainer with the 2 nuts.
| 16. INSTALL NO.2 OIL PAN SUB-ASSEMBLY |
Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the oil pan and oil pan No. 2.
![]() |
Apply a continuous bead of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) as shown in the illustration.
![]() |
Install the oil pan No. 2 with the 15 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.
| 17. INSTALL CRANKSHAFT PULLEY |
![]() |
Using SST, install the pulley set bolt.
| 18. INSTALL NO.1 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the idler pulley with the bolt.
| 19. INSTALL NO.2 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the 2 idler pulleys with the 2 bolts.
| 20. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
| Position | Length |
| A | 70 mm (2.76 in.) |
| B, C, D and E | 33 mm (1.30 in.) |
Use a new bolt in position A.
Finger-tighten the bolts in positions A and E and install the bracket.
Tighten the bolts in positions A and E.
Tighten the bolts in positions B, C and D.
| 21. INSTALL WATER INLET |
Install a new gasket onto the water inlet with thermostat.
Install the water inlet with thermostat with the 3 nuts.
| 22. INSTALL OIL LEVEL GAGE GUIDE |
![]() |
Install a new O-ring onto the oil level gauge guide.
Apply a light coat of engine oil to the O-ring.
Push the oil level gauge guide end into the guide hole of the oil pan.
Install the oil level gauge guide with the bolt.
Install the oil level gauge guide.
| 23. INSTALL ENGINE ASSEMBLY |
| 24. INSTALL BATTERY |
| 25. ADD ENGINE COOLANT |
Pour coolant into the radiator until it overflows.
| Transmission | Capacity |
| Manual Transmission | 9.7 liters (10.3 Us qts, 8.5 Imp. qts) |
| Automatic Transmission | 9.8 liters (10.4 Us qts, 8.6 Imp. qts) |
Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.
Install the radiator cap securely.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Warm up the engine until the cooling fan operates.
Set the air conditioning as follows while warming up the engine.
| Item | Condition |
| Fan Speed | Any setting except OFF |
| Temperature | Toward WARM |
| Air Conditioning Switch | OFF |
Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.
Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine.
Stop the engine and wait until the coolant cools down.
Remove the radiator cap and check the coolant level inside the radiator.
If the coolant level is below the full level, perform the steps from (a) through (h) and repeat the operation until the coolant level remains at the full level.
Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.
| 26. ADD ENGINE OIL |
Fill with fresh engine oil.
| Oil grade | Oil viscosity (SAE) |
| ILSAC multigrade engine oil | 5W-30 |
| Item | Specified Condition |
| Drain and refill with oil filter change | 4.5 liters (4.8 US qts, 4.0 lmp. qts) |
| Drain and refill without oil filter change | 4.2 liters (4.4 US qts, 3.7 lmp. qts) |
| Dry fill | 5.6 liters (5.9 US qts, 4.9 lmp. qts) |
| Item | Specified Condition |
| Drain and refill with oil filter change | 5.2 liters (5.5 US qts, 4.6 lmp. qts) |
| Drain and refill without oil filter change | 4.9 liters (5.2 US qts, 4.3 lmp. qts) |
| Dry fill | 6.0 liters (6.3 US qts, 5.3 lmp. qts) |
Reinstall the oil filler cap.
| 27. CHECK FOR ENGINE COOLANT LEAKAGE |
Fill the radiator with coolant and attach a radiator cap tester.
Pump it to 118 kPa (1.2 kgf/cm2 17.1 psi), then check for leakage.
| 28. CHECK FOR ENGINE OIL LEAKAGE |
| 29. CHECK FOR FUEL LEAKAGE |
| 30. CHECK FOR EXHAUST GAS LEAKAGE |
| 31. INSPECT IGNITION TIMING |
Warm up the engine.
When using the Techstream.
Connect the Techstream to the DLC3.
Enter the following menu items:
Select: Powertrain / Engine and ECT / Data List / IGN Advance.
Inspect the ignition timing during idling.
Check that the ignition timing advances immediately when the engine speed is increased.
![]() |
When not using Techstream.
Using SST, connect the terminals 13 (TC) and 4 (CG) of the DLC3.
Remove the air cleaner.
![]() |
Pull out the wire harness as shown in the illustration.
Connect the tester probe of a timing light to the wire of the ignition coil connector for No. 1 cylinder.
![]() |
Inspect the ignition timing during idling.
Remove the SST from the DLC3.
Inspect the ignition timing during idling.
Install the air cleaner.
| 32. INSPECT ENGINE IDLING SPEED |
Warm up the engine.
When using the Techstream:
Connect the Techstream to the DLC3.
Enter the following menu items:
Select: Powertrain / Engine and ECT / Data List / Engine Speed.
Inspect the engine idling speed.
![]() |
When not using the Techstream:
Using SST, connect the terminal 8 (TAC) of the DLC3.
Race the engine speed at 2,500 rpm for approximately 90 seconds.
Inspect the engine idling speed.
| 33. INSPECT CO/HC |
Start the engine.
Run the engine at 2,500 rpm for approximately 180 seconds.
Insert the CO/HC meter testing probe at least 40 cm (1.3 ft) into the tailpipe during idling.
Immediately check the CO/HC concentration during idling and/or at 2,500 rpm.
If the CO/HC concentration does not comply with regulations, troubleshoot in the order given below.
Check the heated oxygen sensor operation.
| CO | HC | Problems | Causes |
| Normal | High | Rough idling |
|
| Low | High | Rough idling (Fluctuating HC reading) |
|
| High | High | Rough idling (Black smoke from exhaust) |
|