Home › ENGINE · 1GR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (w/ Secondary Air Injection System)

AIR SWITCHING VALVE (w/ Secondary Air Injection System) > INSPECTION

for Preparation Click here



1. INSPECT AIR SWITCHING VALVE ASSEMBLY


A261617
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 5
    20°C (68°F)
    4.5 to 5.5 Ω
    1 - Body ground
    Always
    10 kΩ or higher
    5 - Body ground

    NOTICE:
    When measuring the resistance, do not touch terminals 2, 3, and 4.

    If the result is not as specified, replace the air switching valve.



    A261618E01
  1. Check operation of the air switching valve.

    1. Check that air does not flow from port A to port B.
      Text in Illustration 
      *a
      Air

      NOTICE:
      Make sure the applied pressure is 30 kPa (0.3 kgf*cm2, 4.4 psi) or less.

      If the result is not as specified, replace the air switching valve.



    2. A261619E01
    3. Apply battery voltage across terminals 1 and 5.
      Text in Illustration 
      *a
      Air

      NOTICE:
      When applying voltage, do not touch terminals 2, 3, and 4.

    4. Check that air flows from port A to port B.
      If the result is not as specified, replace the air switching valve.