Home › ENGINE ยท 1GR-FE › LUBRICATION › ENGINE OIL COOLER

ENGINE OIL COOLER > INSTALLATION

for Preparation Click here



1. INSTALL OIL COOLER ASSEMBLY
  1. Clean the oil cooler contact surface on the cooler mounting.

  1. Apply a light coat of engine oil to a new O-ring, and install it into the oil cooler.

  1. Apply a light coat of engine oil to the threads of the oil cooler union bolt.



    A151245
  1. Align the protrusion of the oil filter bracket with the cutout of oil cooler.

  1. Install the oil cooler with the plate washer and oil cooler union bolt.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }



    A151242
  1. Connect the oil cooler hose and No. 2 oil cooler hose to the oil cooler.



2. INSTALL OIL FILTER SUB-ASSEMBLY
  1. Check and clean the oil filter installation surface.

  1. Apply clean engine oil to the gasket of a new oil filter.

  1. Lightly screw the oil filter into place by hand. Tighten it until the gasket contacts the seat.



    A134830E02
  1. Using SST, tighten the oil filter. Depending on the work space available, choose from the following.

    SST
    09228-07501  

    1. If enough space is available, use a torque wrench to tighten the oil filter.

      Torque:
      18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    2. If enough space is not available to use a torque wrench, tighten the oil filter a 3/4 turn by hand or with a common wrench.



3. ADD ENGINE OIL
  1. Remove the oil filler cap.

  1. Add new oil.

    Standard oil grade:

    Oil grade
    Oil Viscosity (SAE)
    ILSAC multigrade engine oil
    5W-30
    (5W-30 is the best choice for good fuel economy and good starting in cold weather.)

    HINT:
    If SAE 5W-30 is not available, use SAE 10W-30.


    Standard oil capacity:

    Item
    Specified Condition
    Drain and refill with oil filter change
    5.2 liters (5.5 US qts, 4.6 Imp. qts)
    Drain and refill without oil filter change
    4.9 liters (5.2 US qts, 4.3 Imp. qts)
    Dry fill
    6.0 liters (6.3 US qts, 5.3 Imp. qts)

  1. Install the oil filler cap.



4. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard capacity:
    9.6 liters (10.1 US qts, 8.4 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.



    A151850E01
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A161780E03
  1. Check that the coolant level is between the FULL and LOW lines.
    If the coolant level is below the LOW line, repeat all of the procedures above.
    If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.



5. CHECK ENGINE OIL LEVEL
  1. Warm up the engine, stop the engine and wait 5 minutes. The oil level should be between the dipstick's low and full level marks.
    If the oil level is low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.



6. INSPECT FOR OIL LEAK


7. INSPECT FOR COOLANT LEAK


A151851

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



8. INSTALL V-BANK COVER


    A112983E02
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }