Home › ENGINE · 2UZ-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 1)

AIR SWITCHING VALVE (for Bank 1) > INSPECTION

for Preparation Click here



1. INSPECT AIR SWITCHING VALVE ASSEMBLY


A158464
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 5
    20°C (68°F)
    4.5 to 5.5 Ω
    1 - Body ground
    Always
    1 MΩ or higher
    5 - Body ground

    NOTICE:
    When measuring the resistance, do not touch terminals 2, 3, and 4.

    If the result is not as specified, replace the air switching valve assembly.



    A158465E01
  1. Check operation of the air switching valve.

    1. Check that air does not flow from port A to port B.

      NOTICE:
      Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.

      If the result is not as specified, replace the air switching valve.



    2. A158466E01
    3. Apply battery voltage across terminals 1 and 5.

      NOTICE:
      When applying voltage, do not touch terminals 2, 3, and 4.

    4. Check that air flows from port A to port B.
      If the result is not as specified, replace the air switching valve.