POWER STEERING GEAR > INSPECTION |
| 1. INSPECT TIE ROD END SUB-ASSEMBLY LH |
![]() |
Secure the tie rod end LH in a vise.
Install the nut to the stud bolt.
Flip the ball joint back and forth 5 times or more.
Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and take the torque reading on the fifth turn.
| 2. INSPECT TIE ROD END SUB-ASSEMBLY RH |
| 3. INSPECT TOTAL PRELOAD |
Temporarily install the 2 steering rack ends to the power steering rack.
![]() |
Using SST, fully turn the power steering rack right and left 10 times to settle it.
![]() |
Using SST, turn the control valve and measure the preload.