Home › ENGINE ยท 1GR-FE › EXHAUST › EXHAUST PIPE (except Regular Cab Standard Deck)

EXHAUST PIPE (except Regular Cab Standard Deck) > INSTALLATION

for Preparation Click here



1. INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)


    A155872E01
  1. Using SST, install the sensor.

    SST
    09224-00010  

    Torque:
    without SST:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }
    with SST:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.). If using a torque wrench with a length that is not 30 cm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (Click here).
    2. Make sure SST and wrench are connected in a straight line.



2. INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1)


    A155868E01
  1. Using SST, install the sensor.

    SST
    09224-00010  

    Torque:
    without SST:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }
    with SST:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.). If using a torque wrench with a length that is not 30 cm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (Click here).
    2. Make sure SST and wrench are connected in a straight line.



3. INSTALL HEATED OXYGEN SENSOR (for Bank 1 Sensor 2)


    A155874E01
  1. Using SST, install the sensor.

    Torque:
    without SST:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }
    with SST:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.). If using a torque wrench with a length that is not 30 cm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (Click here).
    2. Make sure SST and wrench are connected in a straight line.



4. INSTALL HEATED OXYGEN SENSOR (for Bank 2 Sensor 2)


    A155870E01
  1. Using SST, install the sensor.

    Torque:
    without SST:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }
    with SST:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.8 in.). If using a torque wrench with a length that is not 30 cm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (Click here).
    2. Make sure SST and wrench are connected in a straight line.



5. INSTALL FRONT EXHAUST PIPE ASSEMBLY
  1. Install a new gasket and the exhaust pipe to the exhaust manifold RH with 3 new nuts.

    Torque:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.

  1. Connect the heated oxygen sensor connector.

  1. Attach the 2 heated oxygen sensor wire clamps.



6. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY
  1. Connect the front No. 2 exhaust pipe to the exhaust pipe support.

  1. Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.

    Torque:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.

  1. Connect the heated oxygen sensor connector.



7. INSTALL CENTER EXHAUST PIPE ASSEMBLY
  1. Connect the center exhaust pipe to the 3 exhaust pipe supports.

  1. Install 2 new gaskets to the front exhaust pipe LH and RH.

  1. Install the center exhaust pipe with the 4 bolts.

    Torque:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }



8. INSTALL TAILPIPE ASSEMBLY
  1. Connect the tailpipe to the exhaust pipe support.



    A151854E02
  1. Set a new gasket to the center exhaust pipe.

  1. Connect the tailpipe to the center pipe with a new clamp.

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

    HINT:
    Install the clamp within the angle range shown in the illustration.



9. INSPECT FOR EXHAUST GAS LEAK