PROPELLER SHAFT ASSEMBLY (for 4WD) > INSPECTION |
| 1. INSPECT PROPELLER SHAFT ASSEMBLY (for 2 Joint Type) |
![]() |
Using a dial indicator, measure the propeller shaft runout.
| 2. INSPECT PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY (for 3 Joint Type) |
![]() |
Using a dial indicator, measure the intermediate shaft runout.
![]() |
Using a dial indicator, measure the propeller shaft runout.
| 3. INSPECT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING |
![]() |
Mount the propeller shaft in a vise.
Inspect the spider bearing for wear or damage.
Using a dial indicator, measure the spider bearing axial play by turning the yoke of the flange while holding the shaft tightly.
| 4. INSPECT NO. 1 CENTER SUPPORT BEARING ASSEMBLY (for 3 Joint Type) |
![]() |
Check that the bearing turns freely.