Home › ENGINE ยท 2UZ-FE › EMISSION CONTROL › CANISTER

CANISTER > INSPECTION

for Preparation Click here



1. INSPECT CANISTER ASSEMBLY


    A105940
  1. Visually check the canister for cracks or damage.
    If cracks or damage are found, replace the canister assembly.



    A105941E07
  1. Check canister operation.

    1. With the purge port closed, blow 1.67 kPa (0.02 kgf/cm2, 0.24 psi) of air into the vent port, and check that air flows from the air inlet port.
      If the result is not as specified, replace the canister assembly.



    2. A105942E06
    3. With the vent port closed, blow 1.10 kPa (0.01 kgf/cm2, 0.16 psi) of air inlet port, and check that air flows from the purge port.
      If the result is not as specified, replace the canister assembly.



    A105943E06
  1. Check for air leakage.

    1. Remove the air hose between ports A and B.

    2. Connect a pressure gauge to the vent port of the charcoal canister.

    3. With port B, purge port and the air inlet port closed and port A open, apply 19.6 kPa (0.20 kgf/cm2, 2.81 psi) of pressurized air into the vent port, then confirm that pressure is retained for 1 minute.
      If the result is not as specified, replace the canister assembly.



    A105944E01
  1. Check leak detection pump.

    1. Remove the detection pump from the charcoal canister.

    2. Check that air flows from port A to B and then to C.
      If the result is not as specified, replace the canister assembly.



    3. A105945E07
    4. Connect the positive (+) lead of the battery to terminal 7 and the negative (-) lead to terminal 6.

    5. Check that the valve is closed.
      If the result is not as specified, replace the canister assembly.

    6. Install the detection pump.