Home › ENGINE ยท 2UZ-FE › ENGINE MECHANICAL › ENGINE UNIT

ENGINE UNIT > INSTALLATION

for Preparation Click here



1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    A092803E03
  1. Apply adhesive to 2 or 3 threads.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



    A164275E01
  1. Install the ventilation valve.

    Torque:
    27 N*m{ 275 kgf*cm , 20 ft.*lbf }

    HINT:
    After applying the specified torque, rotate the ventilation valve clockwise with the port faced in the direction indicated in the illustration.



2. INSTALL CRANKSHAFT POSITION SENSOR


    A153483
  1. Install the sensor with the bolt.

    Torque:
    6.5 N*m{ 65 kgf*cm , 58 in.*lbf }

  1. Connect the sensor connector.



3. INSTALL KNOCK CONTROL SENSOR


    A160203E01
  1. Install the 2 sensors with the 2 nuts as shown in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 sensor connectors.



4. INSTALL VVT SENSOR


    A159539
  1. Install the 2 sensors with the 2 bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 2 sensor connectors.



5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)


    A191532
  1. Install a new O-ring to the camshaft timing oil control valve.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the camshaft timing oil control valve connector.



6. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)


    A153480
  1. Install a new O-ring to the camshaft timing oil control valve.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the oil control valve with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the camshaft timing oil control valve connector.



7. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH


    A160775
  1. Install the mounting bracket with the 4 bolts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }



8. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH


    A160774
  1. Install the mounting bracket with the 4 bolts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }



9. INSTALL FRONT ENGINE MOUNTING INSULATOR LH


    A160788E01
  1. Install the mounting insulator with the nut.

    Torque:
    72 N*m{ 734 kgf*cm , 53 ft.*lbf }



10. INSTALL FRONT ENGINE MOUNTING INSULATOR RH


    A160787E01
  1. Install the mounting insulator with the nut.

    Torque:
    72 N*m{ 734 kgf*cm , 53 ft.*lbf }



11. INSTALL NO. 2 WIRING HARNESS HEAT INSULATOR


    A160781
  1. Install the heat insulator with the 2 bolts.

    Torque:
    17 N*m{ 173 kgf*cm , 13 ft.*lbf }



12. INSTALL OIL COOLER PIPE


    A108784E04
  1. Using needle-nose pliers, grip the claws of the clamps and slide the clamps to connect the 3 water by-pass hoses.

  1. Install the oil cooler pipe with the cap nut and bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



13. INSTALL REAR WATER BY-PASS JOINT


    A160761
  1. Install 2 new gaskets and the water by-pass joint with the 4 nuts and connect the air hose.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


    HINT:
    A070482E02
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine rear side.



14. INSTALL FRONT WATER BY-PASS JOINT


    A115096
  1. Install 2 new gaskets and the water by-pass joint with the 4 nuts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


    HINT:
    A070482E02
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine front side.



15. INSTALL WATER INLET HOUSING


    A122971E02
  1. Apply seal packing in a continuous line to the places shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1215B or equivalent

    Standard seal diameter:
    2.0 to 3.0 mm (0.0787 to 0.118 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the water pump within 3 minutes after applying seal packing.

  1. Apply soapy water to a new O-ring and install it to the water inlet housing.



    A122972E01
  1. Temporarily install the water inlet housing with the 2 bolts. Uniformly tighten the bolts in several steps.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    Bolt length:
    Item
    Length
    Bolt A
    77 mm (3.03 in.)
    Bolt B
    22 mm (0.866 in.)

  1. Connect the water by-pass hose to the water inlet housing.



16. INSTALL STARTER ASSEMBLY


    A159481
  1. Connect the starter wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the starter connector.

  1. Connect the starter to the cylinder block.

  1. Connect the ground wire with the bolt.

    Torque:
    17 N*m{ 173 kgf*cm , 13 ft.*lbf }

  1. Install the engine wire protector to the starter with the bolt.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }



    A159480
  1. Install the starter with the 2 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }



17. INSTALL AIR PUMP ASSEMBLY


    A158347E01
  1. Install the air pump with the 2 bolts and 2 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. Connect the air pump connector.



18. INSTALL NO. 4 AIR INJECTION SYSTEM HOSE
  1. Install the No. 4 air injection system hose as shown in the illustration.



19. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY


    A160760E02
  1. Apply soapy water to a new O-ring and install it to the water by-pass pipe.

  1. Push in the water by-pass pipe end into the pipe hole of the water pump.

  1. Install the water by-pass pipe with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



20. INSTALL AIR TUBE


    A153517E01
  1. Install the gasket and air tube with the 3 bolts.

    Torque:
    for bolt A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    for bolt B:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }



21. INSTALL INTAKE MANIFOLD


    A156181
  1. Place 2 new gaskets on the intake manifold.

  1. Place the intake manifold on the cylinder heads.



    A156172
  1. Install and uniformly tighten the 6 bolts and 4 nuts in several steps.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



    A156173
  1. Install the engine wire protector with the 2 bolts.

    Torque:
    8.2 N*m{ 83 kgf*cm , 72 in.*lbf }

  1. Connect the 8 injector connectors.



    A163553
  1. Connect the 2 wire clamps to the wire clamp brackets on the RH delivery pipe.



    A163715
  1. Connect the VSV connector (for ACIS).



    A156174E02
  1. Install the wire bracket to the intake manifold with the bolt.

    Torque:
    8.2 N*m{ 83 kgf*cm , 72 in.*lbf }


    1. Connect the engine wire to the wire bracket and engine hanger.



    A156171
  1. Connect the purge line hose to the purge VSV.

  1. Connect the purge VSV connector.



    A191540E01
  1. Connect the No. 1 ventilation hose to the ventilation valve on the LH cylinder head.



    A156170
  1. Connect the 2 water by-pass hoses to the throttle body.

  1. Connect the throttle position sensor and control motor connector.



22. INSTALL NO. 2 WATER BY-PASS PIPE


    A191539
  1. Connect the 2 hoses to the water by-pass pipe.

  1. Install the No. 2 water by-pass pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A191538
  1. Connect the 2 water hoses.



23. INSTALL VACUUM HOSE ASSEMBLY


    A191537
  1. Connect the hose to the intake manifold.

  1. Install the vacuum hose assembly with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



24. INSTALL IGNITION COIL ASSEMBLY


    A191542
  1. Install the 8 ignition coils with the 8 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 8 ignition coil connectors.



25. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2)


A153513E01
  1. Install the air switching valve with the 3 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    Do not hold the bracket of the air switching valve.



26. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)


A191536E01
  1. Install the air switching valve with the 3 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    Do not hold the bracket of the air switching valve.



27. INSTALL NO. 2 AIR HOSE


    A153516
  1. Install the No. 2 air hose.



    A191535
  1. Connect the air pump connector.

  1. Connect the fuel hose clamp.