ENGINE UNIT > INSTALLATION |
| 1. INSTALL VENTILATION VALVE SUB-ASSEMBLY |
![]() |
Apply adhesive to 2 or 3 threads.
![]() |
Install the ventilation valve.
| 2. INSTALL CRANKSHAFT POSITION SENSOR |
![]() |
Install the sensor with the bolt.
Connect the sensor connector.
| 3. INSTALL KNOCK CONTROL SENSOR |
![]() |
Install the 2 sensors with the 2 nuts as shown in the illustration.
Connect the 2 sensor connectors.
| 4. INSTALL VVT SENSOR |
![]() |
Install the 2 sensors with the 2 bolt.
Connect the 2 sensor connectors.
| 5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1) |
![]() |
Install a new O-ring to the camshaft timing oil control valve.
Apply a light coat of engine oil to the O-ring.
Install the camshaft timing oil control valve with the bolt.
Connect the camshaft timing oil control valve connector.
| 6. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2) |
![]() |
Install a new O-ring to the camshaft timing oil control valve.
Apply a light coat of engine oil to the O-ring.
Install the oil control valve with the bolt.
Connect the camshaft timing oil control valve connector.
| 7. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH |
![]() |
Install the mounting bracket with the 4 bolts.
| 8. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH |
![]() |
Install the mounting bracket with the 4 bolts.
| 9. INSTALL FRONT ENGINE MOUNTING INSULATOR LH |
![]() |
Install the mounting insulator with the nut.
| 10. INSTALL FRONT ENGINE MOUNTING INSULATOR RH |
![]() |
Install the mounting insulator with the nut.
| 11. INSTALL NO. 2 WIRING HARNESS HEAT INSULATOR |
![]() |
Install the heat insulator with the 2 bolts.
| 12. INSTALL OIL COOLER PIPE |
![]() |
Using needle-nose pliers, grip the claws of the clamps and slide the clamps to connect the 3 water by-pass hoses.
Install the oil cooler pipe with the cap nut and bolt.
| 13. INSTALL REAR WATER BY-PASS JOINT |
![]() |
Install 2 new gaskets and the water by-pass joint with the 4 nuts and connect the air hose.
![]() |
| 14. INSTALL FRONT WATER BY-PASS JOINT |
![]() |
Install 2 new gaskets and the water by-pass joint with the 4 nuts.
![]() |
| 15. INSTALL WATER INLET HOUSING |
![]() |
Apply seal packing in a continuous line to the places shown in the illustration.
Apply soapy water to a new O-ring and install it to the water inlet housing.
![]() |
Temporarily install the water inlet housing with the 2 bolts. Uniformly tighten the bolts in several steps.
| Item | Length |
| Bolt A | 77 mm (3.03 in.) |
| Bolt B | 22 mm (0.866 in.) |
Connect the water by-pass hose to the water inlet housing.
| 16. INSTALL STARTER ASSEMBLY |
![]() |
Connect the starter wire with the nut.
Connect the starter connector.
Connect the starter to the cylinder block.
Connect the ground wire with the bolt.
Install the engine wire protector to the starter with the bolt.
![]() |
Install the starter with the 2 bolts.
| 17. INSTALL AIR PUMP ASSEMBLY |
![]() |
Install the air pump with the 2 bolts and 2 nuts.
Connect the air pump connector.
| 18. INSTALL NO. 4 AIR INJECTION SYSTEM HOSE |
Install the No. 4 air injection system hose as shown in the illustration.
| 19. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY |
![]() |
Apply soapy water to a new O-ring and install it to the water by-pass pipe.
Push in the water by-pass pipe end into the pipe hole of the water pump.
Install the water by-pass pipe with the bolt.
| 20. INSTALL AIR TUBE |
![]() |
Install the gasket and air tube with the 3 bolts.
| 21. INSTALL INTAKE MANIFOLD |
![]() |
Place 2 new gaskets on the intake manifold.
Place the intake manifold on the cylinder heads.
![]() |
Install and uniformly tighten the 6 bolts and 4 nuts in several steps.
![]() |
Install the engine wire protector with the 2 bolts.
Connect the 8 injector connectors.
![]() |
Connect the 2 wire clamps to the wire clamp brackets on the RH delivery pipe.
![]() |
Connect the VSV connector (for ACIS).
![]() |
Install the wire bracket to the intake manifold with the bolt.
Connect the engine wire to the wire bracket and engine hanger.
![]() |
Connect the purge line hose to the purge VSV.
Connect the purge VSV connector.
![]() |
Connect the No. 1 ventilation hose to the ventilation valve on the LH cylinder head.
![]() |
Connect the 2 water by-pass hoses to the throttle body.
Connect the throttle position sensor and control motor connector.
| 22. INSTALL NO. 2 WATER BY-PASS PIPE |
![]() |
Connect the 2 hoses to the water by-pass pipe.
Install the No. 2 water by-pass pipe with the 2 bolts.
![]() |
Connect the 2 water hoses.
| 23. INSTALL VACUUM HOSE ASSEMBLY |
![]() |
Connect the hose to the intake manifold.
Install the vacuum hose assembly with the bolt.
| 24. INSTALL IGNITION COIL ASSEMBLY |
![]() |
Install the 8 ignition coils with the 8 bolts.
Connect the 8 ignition coil connectors.
| 25. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2) |
![]() |
Install the air switching valve with the 3 nuts.
| 26. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1) |
![]() |
Install the air switching valve with the 3 nuts.
| 27. INSTALL NO. 2 AIR HOSE |
![]() |
Install the No. 2 air hose.
![]() |
Connect the air pump connector.
Connect the fuel hose clamp.