Home › ENGINE ยท 2UZ-FE › ENGINE MECHANICAL › REAR ENGINE MOUNTING

REAR ENGINE MOUNTING > INSTALLATION

for Preparation Click here



1. INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR


  1. for 2WD:



      C155909
    1. Install the mounting insulator to the transmission with the 4 bolts.

      Torque:
      40 N*m{ 408 kgf*cm , 30 ft.*lbf }



  1. for 4WD:



      C157037
    1. Install the mounting insulator to the transmission with the 4 bolts.

      Torque:
      59 N*m{ 602 kgf*cm , 44 ft.*lbf }

    2. Install the mounting heat insulator with the bolt.

      Torque:
      12 N*m{ 122 kgf*cm , 9 ft.*lbf }



2. INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY


  1. for 2WD:



      C155907
    1. Install the crossmember with the 4 bolts, 4 washers and 4 nuts.

      Torque:
      110 N*m{ 1122 kgf*cm , 81 ft.*lbf }



    2. C155908
    3. Install the 4 rear engine mounting insulator bolts.

      Torque:
      16 N*m{ 163 kgf*cm , 12 ft.*lbf }



  1. for 4WD:



      C157035
    1. Install the crossmember with the 4 bolts, 4 washers and 4 nuts.

      Torque:
      110 N*m{ 1122 kgf*cm , 81 ft.*lbf }



    2. C157036
    3. Install the 4 rear engine mounting insulator bolts.

      Torque:
      16 N*m{ 163 kgf*cm , 12 ft.*lbf }