Home › ENGINE ยท 2UZ-FE › EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    A092803E03
  1. Apply adhesive to 2 or 3 threads.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



    A164275E01
  1. Install the ventilation valve.

    Torque:
    27 N*m{ 275 kgf*cm , 20 ft.*lbf }

    HINT:
    After applying the specified torque, rotate the ventilation valve clockwise with the port faced in the direction indicated in the illustration.



2. INSTALL VENTILATION VALVE COVER


3. CONNECT VENTILATION HOSE