Home › TRANSMISSION ยท AB60F AUTOMATIC TRANSMISSION › SHIFT LEVER ASSEMBLY (for Floor Shift Type)

SHIFT LEVER ASSEMBLY (for Floor Shift Type) > INSTALLATION

for Preparation Click here



1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY


C158362E01
  1. Install the floor shift with the 4 bolts. Tighten the bolts in the order shown in the illustration.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }



    C157287E01
  1. Install the cable outer of the transmission control cable to the shift lever retainer, and install a new clip.



    C158381E01
  1. Connect the control cable end to the shift lever.

    NOTICE:
    Make sure to install the cable end so that the inner cable is not twisted. Confirm that the cable end's ridged side is facing upward.

  1. Connect the 2 connectors.



2. INSTALL FRONT CONSOLE BOX


    B161746
  1. Install the front console box with the 6 screws and 2 clips.



3. INSTALL REAR CONSOLE BOX ASSEMBLY


    B161745
  1. Install the rear console box with the 2 screws and 4 bolts.



4. INSTALL CONSOLE BOX CARPET


5. INSTALL REAR CONSOLE END PANEL SUB-ASSEMBLY


    B161744
  1. except Regular Cab:
    Connect the connector.

  1. Attach the 7 clips to install the end panel.



6. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY
  1. w/ Trailer Towing System:
    Connect the connector.

  1. Attach the 6 clips to install the console panel.



  1. Install the clip.


    B171298



7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY


    B161742
  1. Attach the 12 clips to install the console panel.



8. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    B167312
  1. Install the shift lever knob and twist it in the direction indicated by the arrow.



9. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY LH


    B163883
  1. for Automatic Air Conditioning System:
    Attach the 2 claws to install the sensor.



    B168286
  1. Connect the connectors.

  1. Attach the 4 clips and claw to install the finish panel.

  1. Install the 2 bolts.

  1. Install the hood lock control lever.



10. INSTALL COWL SIDE TRIM BOARD LH


B165704
  1. Attach the 2 clips to install the cowl side trim board.

  1. Install the clip.



11. INSTALL FRONT DOOR SCUFF PLATE LH (for Double Cab, CrewMax)


B165841
  1. Attach the 6 claws and 3 clips to install the scuff plate.



12. INSTALL FRONT DOOR SCUFF PLATE LH (for Regular Cab)


B165843
  1. Attach the 6 claws and 3 clips to install the scuff plate.



13. ADJUST SHIFT LEVER POSITION
  1. Move the shift lever to the N position.



    C155901E01
  1. Fold back the transmission control cable adjust case cover. Then while sliding the slider toward the cable end side, press the lock piece from the back side to release the lock.



    C155902E01
  1. Check that the adjust case's spring is applying enough tension to the shift control cable. Then press the lock piece to set the lock.

    NOTICE:
    1. Use your hand to push the lock piece. Do not use any tools.
    2. Securely push the lock piece so that the slider's protrusion is above the lock piece.

  1. Return the cover of the adjust case to its original position.

  1. Inspect the operation after the adjustment.



14. INSPECT SHIFT LEVER POSITION
  1. When moving the shift lever from the P to R position with the ignition switch ON and brake pedal depressed, make sure that it moves smoothly and correctly into position.

  1. Start the engine and make sure that the vehicle moves forward after moving the shift lever from the N to D position and moves rearward after moving the shift lever to the R position.
    If the operation cannot be performed as specified, inspect the park/neutral position switch assembly and check the shift lever assembly installation condition.