Home › ENGINE ยท 2UZ-FE › EXHAUST › EXHAUST MANIFOLD

EXHAUST MANIFOLD > INSTALLATION

for Preparation Click here



1. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH


    A156200E02
  1. Place a new gasket on the cylinder head with the "L" mark facing the manifold side.

    NOTICE:
    Be careful of the installation direction.



    A156204E03
  1. Temporarily install the exhaust manifold, and then uniformly tighten 8 new nuts in several steps, in the sequence shown in the illustration.

    Torque:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }



2. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
  1. Temporarily install the heat insulator with the 4 bolts.



    A156202E03
  1. Uniformly tighten the 4 bolts in several steps, in the sequence shown in the illustration.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



3. INSTALL NO. 2 STEERING INTERMEDIATE SHAFT SUB-ASSEMBLY


C155151E01
  1. Align the matchmarks on the No. 2 steering intermediate shaft and power steering gear.

  1. Install the bolt.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }



4. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH


    A156199E03
  1. Place a new gasket on the cylinder head with the "R" mark facing the manifold side.

    NOTICE:
    Be careful of the installation direction.



    A156203E02
  1. Temporarily install the exhaust manifold, and then uniformly tighten 8 new nuts in several steps, in the sequence shown in the illustration.

    Torque:
    44 N*m{ 428 kgf*cm , 31 ft.*lbf }



5. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
  1. Temporarily install the heat insulator with the 4 bolts.



    A156201E01
  1. Uniformly tighten the 4 bolts in several steps, in the sequence shown in the illustration.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



6. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY (for Regular Cab Standard Deck)
  1. Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.

    Torque:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Install a new gasket and the front No. 2 exhaust pipe to the front No. 3 exhaust pipe with the 2 bolts and 2 nuts.

    Torque:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.

  1. Connect the heated oxygen sensor connector.



7. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY (except Regular Cab Standard Deck)
  1. Connect the front No. 2 exhaust pipe to the exhaust support.

  1. Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.

    Torque:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Install a new gasket and the front No. 2 exhaust pipe to the center exhaust pipe with the 2 bolts.

    Torque:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.

  1. Connect the heated oxygen sensor connector.



8. INSTALL FRONT PROPELLER SHAFT ASSEMBLY (for 4WD)


C158457E01
  1. for Front Differential Side:

    1. Align the matchmarks on the differential and propeller shaft flange.

    2. Install the propeller shaft with the 4 washers and 4 nuts.

      Torque:
      80 N*m{ 816 kgf*cm , 59 ft.*lbf }



    C158456E02
  1. for Transfer Side:

    1. Align the matchmarks on the transfer and propeller shaft flange.

    2. Connect the propeller shaft with the 4 washers and 4 nuts.

      Torque:
      80 N*m{ 816 kgf*cm , 59 ft.*lbf }



9. INSTALL PROPELLER SHAFT HEAT INSULATOR (for 4WD)


    A158903
  1. Install the heat insulator with the 2 bolts.

    Torque:
    16 N*m{ 160 kgf*cm , 12 ft.*lbf }



10. INSTALL FRONT EXHAUST PIPE ASSEMBLY
  1. Install a new gasket and the front exhaust pipe to the exhaust manifold RH with 3 new nuts.

    Torque:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Install a new gasket and the front exhaust pipe to the center exhaust pipe with the 2 bolts.

    Torque:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.

  1. Connect the heated oxygen sensor connector and 2 clamps.



11. INSTALL AIR SWITCHING VALVE ASSEMBLY


A153513E01
  1. Install the air switching valve with the 3 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    Do not hold the bracket of the air switching valve.



12. INSTALL NO. 2 AIR TUBE (for Bank 2)


A153512
  1. Temporarily install a new gasket and the No. 2 air tube to the exhaust manifold side with the 2 nuts.

  1. Install a new gasket and the No. 2 air tube to the air switching valve side with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Tighten the 2 nuts on the exhaust manifold side.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A153510
  1. Connect the air pump connector.

  1. Connect the wire harness clamp.



13. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE
  1. Connect the air injection system hose to the air switching valve.



14. INSTALL WATER BY-PASS PIPE ASSEMBLY


    A156198E01
  1. Connect the 2 water hoses to the transmission oil cooler.

  1. Install the water by-pass pipe with the 3 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



15. CONNECT N0. 5 WATER BY-PASS HOSE


A156193


16. INSTALL HEATER OUTLET WATER HOSE


A156187


17. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE


    A150112E02
  1. Apply a light coat of engine oil to a new O-ring.

  1. Install a new O-ring to the guide.

  1. Install the dipstick guide with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Install the dipstick.



18. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)


A191536E01
  1. Install the air switching valve with the 3 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    Do not hold the bracket of the air switching valve.



19. INSTALL NO. 3 AIR TUBE (for Bank 1)


A153518
  1. Temporarily install a new gasket and the No. 3 air tube to the exhaust manifold side with the 2 nuts.

  1. Install a new gasket and the No. 3 air tube to the air switching valve side with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Tighten the 2 nuts on the exhaust manifold side.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



20. INSTALL NO. 2 AIR HOSE (for Bank 1)


    A153516
  1. Install the No. 2 air hose.



    A191535
  1. Connect the air pump connector.

  1. Connect the fuel hose clamp.



21. INSTALL AIR CLEANER ASSEMBLY


    A156197
  1. Install the air cleaner case with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the air cleaner element onto the air cleaner case.



    A156196E01
  1. Install the air cleaner cap.

    1. Fasten the 4 hook clamps.

    2. Connect the MAF meter connector.

    3. Attach the wire harness clamp.



22. INSTALL AIR CLEANER HOSE ASSEMBLY


    A153488E01
  1. Install the air cleaner hose.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Make sure that the clamp band end is aligned with the limit mark when the hose clamps is tightened, as indicated by A and B in the illustration.

  1. Connect the vacuum hose and No. 2 ventilation hose.



23. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard capacity:
    9.7 liters (10.3 US qts, 8.5 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.



    A151850E03
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm and warm up the engine until the cooling fan operates.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A151850E04
  1. Check that the coolant level is between the FULL and LOW lines. If the coolant level is below the LOW line, repeat all of the procedures above. If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.



24. INSPECT FOR COOLANT LEAK

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A162054
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop. If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



25. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY


    A156182E01
  1. Align the protrusion of a new gasket with the groove of the intake manifold, and install the gasket.



    A156180E01
  1. Install the throttle body with the nut and 3 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }



26. INSTALL NO. 1 ENGINE UNDER COVER


    A150108
  1. Hook the engine under cover onto the vehicle body as shown in the illustration.

  1. Install the 3 screws and 5 bolts.

    Torque:
    for bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for screw:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



27. INSPECT FOR EXHAUST GAS LEAK
If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.


28. INSTALL FRONT FENDER APRON SEAL LH
  1. Install the fender apron seal with the 6 clips.



29. INSTALL FRONT FENDER APRON SEAL REAR LH
  1. Install the fender apron seal with the 5 clips.



30. INSTALL FRONT FENDER APRON SEAL RH
  1. Install the fender apron seal with the 6 clips.



31. INSTALL FRONT FENDER APRON SEAL REAR RH
  1. Install the fender apron seal with the 5 clips.