PRESSURE SWITCH > INSTALLATION |
| 1. INSTALL PRESSURE SWITCH |
![]() |
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the pressure switch.
Install the O-ring on the pressure switch.
Install the switch.
Connect the connector.
| 2. CHARGE REFRIGERANT |
Perform vacuum purging using a vacuum pump.
Charge refrigerant HFC-134a (R134a).

| 3. WARM UP ENGINE |
Warm up the engine at less than 1500 rpm for 1 minute or more after charging the refrigerant.
| 4. CHECK FOR LEAKAGE OF REFRIGERANT |
After recharging the refrigerant gas, check for refrigerant gas leakage using a halogen leak detector.
Perform the operation under the following conditions:
![]() |
Using a halogen leak detector, check the refrigerant line for leakage.
If a gas leak is not detected on the drain hose, remove the blower motor control (blower resistor) from the cooling unit. Insert the halogen leak detector sensor into the unit and perform the test.
Disconnect the connector and wait for approximately 20 minutes. Bring the halogen leak detector close to the pressure switch and perform the test.