Home › ENGINE ยท 1UR-FE › CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


    A216790
  1. Install the generator with the 3 bolts and nut.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



    A215539
  1. Install the harness bracket to the generator with the bolt.

    Torque:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }

  1. Connect the generator connector.

  1. Connect the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.



2. CONNECT OIL COOLER TUBE SUB-ASSEMBLY (w/ Trailer Towing System)


    A217475
  1. Connect the oil cooler tube with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }



3. CONNECT VANE PUMP ASSEMBLY


A163333E01

HINT:
Before performing the following procedures, move the spacer until the vane pump can be installed.



    A163289
  1. Connect the vane pump to the timing chain cover with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



4. CONNECT SOLENOID VALVE CONNECTOR


C181333
  1. Connect the solenoid valve connector.



5. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR


C181326
  1. Connect the oil pressure sensor connector.



6. INSTALL FRONT FENDER APRON SEAL RH
  1. Install the fender apron seal with the 6 clips.



7. INSTALL AIR CLEANER ASSEMBLY


    A215422
  1. Install the air cleaner with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Tighten the hose clamp.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the ventilation hose and vacuum hose.

  1. Connect the MAF meter connector and clamp.



8. INSTALL FAN AND GENERATOR V BELT
  1. Install the fan and generator V belt (Click here).



9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL