PROPELLER SHAFT ASSEMBLY (for 4WD) > REASSEMBLY |
| 1. INSTALL REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING |
![]() |
Apply MP grease to a new spider and 4 new bearings.
Measure dimension A between the snap ring grooves.
![]() |
Install the 4 spider bearings to the spider journal portions, and then measure dimension B of the universal joint.
w/o Grease Fitting Spider Bearing:
![]() |
Select snap rings to make dimensions A and B the same.
| Color | Thickness |
| Purple | 1.46 mm (0.0574 in.) |
| Black | 1.49 mm (0.0586 in.) |
| Copper | 1.51 mm (0.0594 in.) |
| White | 1.56 mm (0.0614 in.) |
| Yellow | 1.59 mm (0.0625 in.) |
| Blue | 1.64 mm (0.0646 in.) |
| Color | Thickness |
| Black | 1.52 mm (0.0598 in.) |
| Black | 1.54 mm (0.0606 in.) |
| Black | 1.57 mm (0.0618 in.) |
| Black | 1.62 mm (0.0638 in.) |
w/ Grease Fitting Spider Bearing:
![]() |
Select snap rings to make dimensions A and B the same.
| Color | Thickness |
| Black | 1.49 mm (0.0586 in.) |
| Copper | 1.51 mm (0.0594 in.) |
| White | 1.56 mm (0.0614 in.) |
| Yellow | 1.59 mm (0.0625 in.) |
Temporarily install the spider and 2 universal joint spider bearings into the flange yoke.
![]() |
Using SST, press the universal joint spider bearing into the flange yoke until the groove can be seen.
![]() |
Using needle-nose pliers, install the previously selected snap ring into the groove of the yoke.
Temporarily install the spider and 2 universal joint spider bearings into the shaft yoke.
![]() |
Using SST, press the universal joint spider bearing into the shaft yoke until the groove can be seen.
![]() |
Using needle-nose pliers, install the previously selected snap ring into the groove on the shaft yoke.
| 2. INSTALL NO. 1 CENTER SUPPORT BEARING ASSEMBLY (for 3 Joint Type) |
Coat the splines of the intermediate shaft with MP grease.
![]() |
Install the center support bearing to the intermediate shaft.
Align the matchmarks on the joint yoke and intermediate shaft.
![]() |
Install the washer.
Clamp the yoke in a vise, and press the bearing into position by installing a new lock nut.
Loosen the lock nut.
Tighten the lock nut again.
Using a chisel and hammer, stake the lock nut.
| 3. INSTALL REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING (for 3 Joint Type) |
![]() |
Apply MP grease to a new spider and 4 new bearings.
![]() |
Measure dimension A between the snap ring grooves.
Install the 4 spider bearings to the spider journal portions, and then measure dimension B of the universal joint.
w/o Grease Fitting Spider Bearing:
![]() |
Select snap rings to make dimensions A and B the same.
| Color | Thickness |
| Purple | 1.46 mm (0.0574 in.) |
| Black | 1.49 mm (0.0586 in.) |
| Copper | 1.51 mm (0.0594 in.) |
| White | 1.56 mm (0.0614 in.) |
| Yellow | 1.59 mm (0.0625 in.) |
| Blue | 1.64 mm (0.0646 in.) |
| Color | Thickness |
| Black | 1.52 mm (0.0598 in.) |
| Black | 1.54 mm (0.0606 in.) |
| Black | 1.57 mm (0.0618 in.) |
| Black | 1.62 mm (0.0638 in.) |
![]() |
w/ Grease Fitting Spider Bearing:
Select snap rings to make dimensions A and B the same.
| Color | Thickness |
| Black | 1.49 mm (0.0586 in.) |
| Copper | 1.51 mm (0.0594 in.) |
| White | 1.56 mm (0.0614 in.) |
| Yellow | 1.59 mm (0.0625 in.) |
Temporarily install the universal joint spider and 2 universal joint spider bearings into the propeller shaft yoke.
![]() |
Using SST, press the universal joint spider bearing into the propeller shaft yoke until the groove can be seen.
![]() |
Using needle-nose pliers, install the previously selected snap ring into the groove of the yoke.
Align the matchmarks on the propeller shaft yoke and universal joint yoke, and temporarily install the spider and 2 universal joint spider bearings into the universal joint yoke.
![]() |
Using SST, press the universal joint spider bearing into the universal joint yoke until the groove can be seen.
Using needle-nose pliers, install the previously selected snap ring into the groove on the universal joint yoke.
| 4. INSTALL PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING |
![]() |
Check the spider bearings for wear and damage.
Measure each spider bearing's axial play by turning the yoke while holding the shaft tightly.