Home › ENGINE ยท 3UR-FBE › EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL CHARCOAL CANISTER LEAK DETECTION PUMP SUB-ASSEMBLY


    A259575
  1. Install a new charcoal canister leak detection pump with the 3 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

    NOTICE:
    1. Do not allow foreign matter such as grease, oil or water to adhere to the O-rings.
    2. Ensure that the claws are engaged properly.

  1. Connect the vacuum hose.



2. INSTALL CANISTER ASSEMBLY


    A147035
  1. Install the canister with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }



    A147033
  1. Connect the wire harness clamp.



    A156068E01
  1. Connect the vent line hose.

    1. Push the hose into the port and push the retainer to lock it.

      NOTICE:
      1. Check for damage or foreign objects on the connected part.
      2. After connecting, check that the vent hose and the valve are securely connected by pulling on them.

  1. Connect the air inlet line hose.

    NOTICE:
    1. Check for damage or foreign objects on the connected part.
    2. After connecting, check that the vent hose and the valve are securely connected by pulling on them.

  1. Connect the purge line hose.

  1. Connect the connector.



    A147034
  1. Connect the wire harness clamp bracket with the nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }