WATER PUMP > INSTALLATION |
| 1. INSTALL WATER PUMP ASSEMBLY |
![]() |
Install a new gasket and the water pump with the 8 bolts shown in the illustration.
| 2. INSTALL WATER PUMP PULLEY |
![]() |
Temporarily install the pulley with the 4 bolts.
Using SST, hold the pulley and tighten the 4 bolts.
| 3. INSTALL WATER INLET HOUSING |
Install a new gasket to the water pump.
![]() |
Install the No. 3 water by-pass hose and water inlet housing with the 3 bolts.
![]() |
Install the air tube bracket bolt.
Connect the No. 5 water by-pass hose.
![]() |
Connect the air pump connector clamp's holder.
Attach the wire harness clamp.
Connect the air pump connector.
Connect the No. 2 and No. 3 air hoses.
| 4. CONNECT WATER BY-PASS PIPE (w/ Oil Cooler) |
![]() |
Connect the water by-pass pipe with water hose.
Install the 3 bolts.
Connect the No. 6 water by-pass hose.
| 5. INSTALL NO. 1 WATER BY-PASS HOSE |
Connect the No. 1 water by-pass hose to the water by-pass joint and water inlet housing.
| 6. INSTALL FAN SHROUD |
Install the fan pulley to the fan bracket.
Place the shroud together with the coupling fan between the radiator and engine.
Temporarily install the fluid coupling fan to the fan bracket with the 4 nuts. Tighten the nuts as much as possible by hand.
![]() |
Attach the shroud's claws to the radiator as shown in the illustration.
Install the shroud with the 2 bolts.
Connect the reservoir hose to the upper radiator tank.
Install the fan and generator V-belt.
![]() |
Tighten the 4 nuts of the fluid coupling fan.
| 7. CONNECT INLET RADIATOR HOSE |
| 8. CONNECT OUTLET RADIATOR HOSE |
| 9. INSTALL AIR CLEANER ASSEMBLY |
![]() |
Install the air cleaner case with the 2 bolts.
Install the air cleaner element onto the air cleaner case.
![]() |
Install the air cleaner cap.
Fasten the 4 hook clamps.
Connect the MAF meter connector.
Attach the wire harness clamp.
| 10. INSTALL AIR CLEANER HOSE ASSEMBLY |
![]() |
Install the air cleaner hose with the 2 clamps.
Connect the vacuum hose and ventilation hose.
| 11. ADD ENGINE COOLANT |
Add engine coolant.
| Item | Specified Condition |
| w/ Trailer Towing System | 13.0 liters (13.7 US qts, 11.4 Imp. qts) |
| w/o Trailer Towing System | 12.1 liters (12.8 US qts, 10.6 Imp. qts) |
![]() |
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Install the reservoir cap.
Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.
Install the radiator cap.
Start the engine and warm it up until the thermostat opens.
Maintain the engine speed at 2000 to 2500 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine, and wait until the engine coolant cools down to ambient temperature.
![]() |
Check that the coolant level is between the FULL and LOW lines.
If the coolant level is below the LOW line, repeat all of the procedures above.
If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.
| 12. INSPECT FOR COOLANT LEAK |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.
| 13. INSTALL V-BANK COVER SUB-ASSEMBLY |
![]() |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.
| 14. INSTALL NO. 1 ENGINE UNDER COVER |
![]() |
Hook the engine under cover to the vehicle body as shown in the illustration.
Install the 3 screws and 5 bolts.