AIR SWITCHING VALVE (for Bank 1) > INSTALLATION |
| 1. INSTALL EMISSION CONTROL VALVE SET |
Install the emission control valve set with the 3 nuts.
![]() |
Align the paint mark with the projection and connect the air hose.
| *1 | Projection |
| *2 | Paint Mark |
| *a | Upper |
| *b | RH Side |
Connect the emission control valve set connector.
| 2. INSTALL AIR TUBE |
![]() |
Install 2 new gaskets to the air tube as shown in the illustration.
| *1 | New Gasket |
| *2 | Air Tube |
Install the air tube with the 2 bolts and 2 nuts.
| 3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY |
Install the air cleaner case with the 2 bolts.
Attach the wire harness clamp.
Install the air cleaner filter element.
| 4. INSTALL AIR CLEANER CAP AND HOSE |
![]() |
Install the air cleaner cap and hose.
| *a | Top |
| *b | Front |
| *c | RH Side |
| *d | Align cutout portion of hose with protrusion of throttle |
| *e | Paint Mark |
Attach the 4 hook clamps to install the air cleaner cap and hose.
Tighten the clamp.
Attach the 4 clamps and connect the ventilation hose, vacuum hose and mass air flow meter connector.