Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 1)

AIR SWITCHING VALVE (for Bank 1) > INSTALLATION

for Preparation Click here



1. INSTALL EMISSION CONTROL VALVE SET
  1. Install the emission control valve set with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A239081E01
  1. Align the paint mark with the projection and connect the air hose.
    Text in Illustration 
    *1
    Projection
    *2
    Paint Mark
    *a
    Upper
    *b
    RH Side

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the emission control valve set connector.



2. INSTALL AIR TUBE


    A239082E01
  1. Install 2 new gaskets to the air tube as shown in the illustration.
    Text in Illustration 
    *1
    New Gasket
    *2
    Air Tube

  1. Install the air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
  1. Install the air cleaner case with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Attach the wire harness clamp.

  1. Install the air cleaner filter element.



4. INSTALL AIR CLEANER CAP AND HOSE


    A239076E01
  1. Install the air cleaner cap and hose.
    Text in Illustration 
    *a
    Top
    *b
    Front
    *c
    RH Side
    *d
    Align cutout portion of hose with protrusion of throttle
    *e
    Paint Mark

    1. Attach the 4 hook clamps to install the air cleaner cap and hose.

    2. Tighten the clamp.

      Torque:
      4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    3. Attach the 4 clamps and connect the ventilation hose, vacuum hose and mass air flow meter connector.

      HINT:
      The direction of the hose clamp is indicated in the illustration.