Home › ENGINE ยท 3UR-FE › ENGINE MECHANICAL › ENGINE UNIT

ENGINE UNIT > INSTALLATION

for Preparation Click here



1. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 8 ignition coils with the 8 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



2. INSTALL KNOCK SENSOR


A152496E02
  1. Install the 4 sensors with the 4 bolts so that the sensors are angled as shown in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    NOTICE:
    The acceptable installation angle of the sensor is between 10° upward and downward from the horizontal position.

  1. Connect the 4 sensor connectors.



3. INSTALL SEPARATOR CASE


A163108
  1. Install the separator case with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



4. INSTALL ENGINE WIRE


A160651
  1. Connect the 3 clamps and 4 knock sensor connectors.



5. INSTALL NO. 3 AIR TUBE


    A158585E01
  1. Install a new gasket and the No. 3 air tube with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Make sure the gasket's claws are not caught between the air tube and air switching valve.

    HINT:
    The identification color on the flange is orange.



6. INSTALL NO. 2 AIR TUBE


    A158584E01
  1. Install a new gasket and the No. 2 air tube with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Make sure the gasket's claws are not caught between the air tube and air switching valve.

    HINT:
    The identification color on the flange is blue.



7. INSTALL AIR SWITCHING VALVE ASSEMBLY


    A158586
  1. Install the air switching valve with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 air switching valve connectors.



    A158583
  1. Install the bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the knock sensor connector.



8. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY


    A162551
  1. Connect the 2 hoses.

  1. Install the water by-pass pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A162550
  1. Connect the air tube with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



9. INSTALL WATER INLET HOUSING


    A162555E01
  1. Install a new gasket to the timing chain cover.



    A162554
  1. Install the water inlet with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



10. INSTALL AIR TUBE


    A162553
  1. Connect the 2 hoses.

  1. Install the air tube with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



11. INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY


    A118764E02
  1. Apply adhesive to 2 or 3 threads of the oil pressure sender gauge.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent



    A162467
  1. Install the oil pressure sender gauge.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

    NOTICE:
    Do not start the engine within 1 hour after installation.



    A163657
  1. Connect the sender gauge connector.



12. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY


    A162557
  1. Install the idler pulley with the bolt.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



13. INSTALL WATER PUMP PULLEY


    A162556E01
  1. Temporarily install the pulley with the 4 bolts.

  1. Using SST, hold the pulley and tighten the 4 bolts.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



14. INSTALL NO. 1 ENGINE COVER


A158656

NOTICE:
Make sure that the No. 1 engine cover is level with the top surface of the intake port of the cylinder head for 1 and 2.

HINT:
  1. Align the No. 1 engine cover cutouts with the air tube.
  2. Align the No. 1 engine cover with the air switching valve surface and cylinder head wall.



15. INSTALL NO. 2 ENGINE COVER


A158538

NOTICE:
Make sure that the No. 2 engine cover is level with the top surface of the intake port if the cylinder head.

HINT:
  1. Align the No. 2 engine cover cutout with the air tube.
  2. Align the No. 2 engine cover with the front water by-pass joint and cylinder head wall.



16. INSTALL FRONT WATER BY-PASS JOINT


    A162552
  1. Install 2 new gaskets and the water by-pass joint with the 4 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the No. 2 water by-pass hose to the water by-pass joint.



17. INSTALL NO. 1 WATER BY-PASS HOSE


    A162549
  1. Install the No. 1 water by-pass hose by connecting the hose to the water inlet housing and front water by-pass joint.



18. INSTALL NO. 2 WATER BY-PASS PIPE


    A165547
  1. Connect the 4 hoses.

  1. Install the water by-pass hose with the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



19. INSTALL FUEL TUBE SUB-ASSEMBLY


A256360


20. INSTALL NO. 2 FUEL TUBE SUB-ASSEMBLY


    A256359
  1. Install the No. 2 fuel tube with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



21. INSTALL INTAKE MANIFOLD


    A162094
  1. Place 2 new gaskets on the intake manifold.

  1. Place the intake manifold on the cylinder head.



    A165478
  1. Install and uniformly tighten the 8 bolts and 2 nuts in several steps.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A165472
  1. Install the wire bracket to the intake manifold with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



    A165471
  1. Connect the 3 wire clamps to the 3 wire brackets.



    A165518
  1. Connect the No. 1 tube and install it to the intake manifold with the 2 bolts.

    Torque:
    8.2 N*m{ 83 kgf*cm , 73 in.*lbf }



    A162082
  1. Connect the purge VSV connector.

  1. Connect the purge line hose to the purge VSV.

  1. Connect the vacuum switching valve connector (for ACIS).



    A162089
  1. Install the No. 1 engine cover sub-assembly.



    A162090
  1. Install the No. 3 engine cover.



    A162103
  1. Connect the No. 1 ventilation hose.



    A198620
  1. Connect the 2 water by-pass hoses.

  1. Connect the throttle body connector.



22. INSTALL NO. 1 TUBE


    A163943
  1. Install the No. 1 tube with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



23. CONNECT VENTILATION HOSE ASSEMBLY


    A162091E01
  1. Connect the ventilation hose to the ventilation pipe of the cylinder head cover LH and RH.



24. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY RH


    A256330
  1. Install the 2 delivery pipe spacers and 4 insulators to the cylinder head RH.

  1. Install the delivery pipe (with injectors) to the cylinder head RH.



  1. Install the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


    NOTICE:
    A163659E01
    Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.

  1. Install the No. 3 engine cover.



    A161422
  1. Connect the No. 6 wire harness connector.

  1. Connect the ventilation hose.



25. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY LH


    A256331
  1. Install the 2 delivery pipe spacers and 4 insulators to the cylinder head LH.

  1. Install the delivery pipe (with injectors) to the cylinder head LH.



  1. Install the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


    NOTICE:
    A163659E01
    Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.

  1. Connect the No. 7 wire harness connector.

  1. Install the No. 1 engine cover.



26. INSTALL NO. 1 ENGINE MOUNTING BRACKET LH


A160648
  1. Install the mounting bracket with the 4 bolts.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }



27. INSTALL NO. 1 ENGINE MOUNTING BRACKET RH


A160649
  1. Install the mounting bracket with the 4 bolts.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }



28. INSTALL FRONT ENGINE MOUNTING INSULATOR RH


    A163786
  1. Install the mounting insulator with the nut.

    Torque:
    72 N*m{ 734 kgf*cm , 53 ft.*lbf }



29. INSTALL CYLINDER BLOCK WATER DRAIN COCK SUB-ASSEMBLY


A076531E01
  1. Apply adhesive to 2 or 3 threads of the drain cocks.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent



    A163841E01
  1. Install the water drain cocks.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

  1. Further tighten the drain cocks within 360° so that the drain cock pipes are within the range shown in the illustration.

    NOTICE:
    1. Do not rotate the drain cocks more than 1 revolution (360°) after tightening the drain cocks to the specified torque.
    2. Do not loosen the drain cocks to adjust them. If an adjustment is necessary, remove the drain cocks and reinstall them.

  1. Install the water drain cock plugs to the water drain cocks.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



30. INSTALL FRONT ENGINE MOUNTING INSULATOR LH


    A163787
  1. Install the mounting insulator with the nut.

    Torque:
    72 N*m{ 734 kgf*cm , 53 ft.*lbf }



31. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY


A164311
  1. Install the No. 1 fuel pipe (Click here).



32. INSTALL ENGINE WIRE


A259652E01
  1. Install the engine wire.

  1. Engine Rear Side:

    1. Install the 3 wires with the 3 bolts.

      Torque:
      8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

    2. Connect the 5 clamps.

    3. Connect the 3 connectors.



    A259650
  1. Engine RH Side:

    1. Connect the 9 clamps.

    2. Connect the oil pressure sender gauge connector.

    3. Connect the throttle sensor connector.

    4. Connect the fuel injector connector.

    5. Connect the 2 VVT sensor connectors.

    6. Connect the 4 ignition coil connectors.

    7. Connect the 2 camshaft timing control valve connectors.



    A259653
  1. Engine LH Side:

    1. Connect the 8 clamps and install the engine wire with the bolt.

      Torque:
      20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    2. Connect the fuel injector connector.

    3. Connect the engine coolant temperature sensor connector.

    4. Connect the purge VSV connector.

    5. Connect the vacuum switching valve connector (for ACIS).

    6. Connect the camshaft position sensor connector.

    7. Connect the 2 VVT sensor connectors.

    8. Connect the 4 ignition coil connectors.

    9. Connect the 2 camshaft timing control valve connector.