Home › BODY ELECTRICAL › OTHER SYSTEM › VOLTAGE INVERTER (for CrewMax)

VOLTAGE INVERTER (for CrewMax) > INSTALLATION

for Preparation Click here



1. INSTALL VOLTAGE INVERTER ASSEMBLY


    B170298E01
  1. Connect the voltage inverter connector.

  1. Install the voltage inverter with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



2. INSTALL LOWER QUARTER TRIM PANEL ASSEMBLY LH


B169212
  1. Attach the 4 clips to install the lower quarter trim panel.



    B165831
  1. Connect the outer lap belt anchor with the bolt.

    Torque:
    42 N*m{ 428 kgf*cm , 31 ft.*lbf }



    B165830
  1. Attach the 2 claws to install the cover.



3. INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP LH


4. INSTALL REAR DOOR SCUFF PLATE LH


B169218
  1. Attach the 8 claws and 2 clips to install the rear door scuff plate.



5. INSTALL BACK PANEL TRIM LH
  1. Attach the 8 clips to install the back panel trim.



  1. Install the package holder net hook.


    B170105E05



6. INSTALL BACK PANEL TRIM RH


B169224E05
  1. Attach the 8 clips to install the back panel trim.

  1. Install the package holder net hook.