Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > INSTALLATION

for Preparation Click here



1. INSTALL NO. 2 EMISSION CONTROL VALVE SET
  1. Install the No. 2 emission control valve set with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A239088E01
  1. Align the paint mark with the projection and connect the air hose.
    Text in Illustration 
    *1
    Paint Mark
    *2
    Projection
    *a
    Top
    *b
    LH Side

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the No. 2 emission control valve set connector.



2. CONNECT WIRE HARNESS
  1. Install the bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the 3 clamps and connect the wire harness.



3. INSTALL NO. 2 AIR TUBE


    A239089E01
  1. Install 2 new gaskets to the No. 2 air tube as shown in the illustration.
    Text in Illustration 
    *1
    New Gasket
    *2
    No. 2 Air Tube

  1. Install the No. 2 air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



4. INSTALL PURGE VSV
(Click here)