AIR SWITCHING VALVE (for Bank 2) > INSTALLATION |
| 1. INSTALL NO. 2 EMISSION CONTROL VALVE SET |
Install the No. 2 emission control valve set with the 3 nuts.
![]() |
Align the paint mark with the projection and connect the air hose.
| *1 | Paint Mark |
| *2 | Projection |
| *a | Top |
| *b | LH Side |
Connect the No. 2 emission control valve set connector.
| 2. CONNECT WIRE HARNESS |
Install the bracket with the bolt.
Attach the 3 clamps and connect the wire harness.
| 3. INSTALL NO. 2 AIR TUBE |
![]() |
Install 2 new gaskets to the No. 2 air tube as shown in the illustration.
| *1 | New Gasket |
| *2 | No. 2 Air Tube |
Install the No. 2 air tube with the 2 bolts and 2 nuts.
| 4. INSTALL PURGE VSV |