AIR SWITCHING VALVE (for Bank 2) > REMOVAL |
| 1. REMOVE PURGE VSV |
| 2. REMOVE NO. 2 AIR TUBE |
![]() |
Remove the 2 bolts, 2 nuts and No. 2 air tube.
Remove the 2 gaskets from the No. 2 air tube.
| 3. DISCONNECT WIRE HARNESS |
![]() |
Detach the 3 clamps and disconnect the wire harness.
Remove the bolt and bracket.
| 4. REMOVE NO. 2 EMISSION CONTROL VALVE SET |
![]() |
Disconnect the No. 2 emission control valve set connector.
Disconnect the air hose.
![]() |
Remove the 3 nuts and No. 2 emission control valve set.