Home › ENGINE ยท 1UR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 2)

AIR SWITCHING VALVE (for Bank 2) > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER SUB-ASSEMBLY


    A214822E01
  1. Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.



2. REMOVE AIR CLEANER HOSE ASSEMBLY


    A214569
  1. Disconnect the vacuum sensing hose and ventilation hose.

  1. Loosen the 2 clamps.

  1. Remove the air cleaner hose.



3. DISCONNECT NO. 3 VENTILATION HOSE


    A214254
  1. Disconnect the No. 3 ventilation hose.



4. DISCONNECT NO. 1 AIR HOSE


    A214256
  1. Disconnect the No. 1 air hose.



5. REMOVE AIR SWITCHING VALVE ASSEMBLY


    A214255
  1. Disconnect the connector and clamp.

  1. Remove the bolt and disconnect the wire harness clamp bracket.



    A214299
  1. Remove the 2 bolts.



    A214258
  1. Remove the 3 bolts, air switching valve and gasket.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.