Home › ENGINE · 1UR-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSPECTION

for Preparation Click here



1. INSPECT PURGE VSV


A148341E06
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    23 to 26 Ω
    1 - VSV body ground
    Always
    10 MΩ or higher
    2 - VSV body ground
    10 MΩ or higher

    If the result is not as specified, replace the purge VSV.



    A214835E01
  1. Inspect the purge VSV operation.

    1. Check that air does not flow from ports.



    2. A148343E01
    3. Apply battery voltage across the terminals.

    4. Check that air flows from ports.
      If the result is not as specified, replace the purge VSV.